64
Commissioning steps
Inspection steps
Maintenance steps
Page
•
20. Commissioning the system
........................................... 77
•
21. Ticking the heat pump type on the type plate of the
internal unit (as per external unit type plate)
•
•
•
22. Checking the heat pump for unusual noises (e.g.
operating noise from fan, compressor or pump);
venting again if required
•
•
•
23. Checking the system function (e.g. actuators,
temperatures, heat meter if applicable)
........................ 87
•
24. Instructing the system user
........................................... 87
Commissioning, inspection, maintenance
Steps - commissioning, inspection and…
(cont.)
5546 699 GB
Содержание AWT-AC 241.A04
Страница 19: ...19 SLP N 9 11 aCH sG lJ 10 Installation sequence Installing the internal unit cont 5546 699 GB Installation...
Страница 20: ...20 X20 2x 16 17 2x 12 14 18 13 15 Installation sequence Installing the internal unit cont 5546 699 GB...
Страница 21: ...21 2x 4x 4x 6x 21 19 20 22 Installation sequence Installing the internal unit cont 5546 699 GB Installation...
Страница 89: ...89 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5546 699 GB Service...
Страница 104: ...104 0010 0009 0007 0002 0004 0008 0001 0005 0003 0006 Parts lists internal unit Casing internal unit cont 5546 699 GB...
Страница 165: ...165 5546 699 GB...
Страница 166: ...166 5546 699 GB...
Страница 167: ...167 5546 699 GB...