32
2x
5.
5.
Flare the pipe bends on their open
end and secure connection piece
(twin connector) with union nuts.
Note
■ Flare the pipe end of the hot gas
line by approx. 0.5 mm.
■ Connection pieces must not be
positioned diagonally. Check the
flared connections for firm seating.
Installation sequence
Connecting refrigerant lines
(cont.)
5546 699 GB
Содержание AWT-AC 241.A04
Страница 19: ...19 SLP N 9 11 aCH sG lJ 10 Installation sequence Installing the internal unit cont 5546 699 GB Installation...
Страница 20: ...20 X20 2x 16 17 2x 12 14 18 13 15 Installation sequence Installing the internal unit cont 5546 699 GB...
Страница 21: ...21 2x 4x 4x 6x 21 19 20 22 Installation sequence Installing the internal unit cont 5546 699 GB Installation...
Страница 89: ...89 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5546 699 GB Service...
Страница 104: ...104 0010 0009 0007 0002 0004 0008 0001 0005 0003 0006 Parts lists internal unit Casing internal unit cont 5546 699 GB...
Страница 165: ...165 5546 699 GB...
Страница 166: ...166 5546 699 GB...
Страница 167: ...167 5546 699 GB...