30
1.
2.
3.
2x
C
Liquid line
D
Hot gas line
!
Please note
Ensure that no contamination
(e.g. metal swarf) or moisture
enters the copper pipes.
For this, hold the pipe openings
downwards or temporarily seal
them with a plug.
Note
■ The refrigerant lines of the internal unit
are filled with nitrogen; overpressure
2 bar (0.2 MPa).
■ If flanged Euro adaptors are used,
braze the connections using a shield-
ing gas.
Installation sequence
Connecting refrigerant lines
(cont.)
5546 699 GB
Содержание AWT-AC 241.A04
Страница 19: ...19 SLP N 9 11 aCH sG lJ 10 Installation sequence Installing the internal unit cont 5546 699 GB Installation...
Страница 20: ...20 X20 2x 16 17 2x 12 14 18 13 15 Installation sequence Installing the internal unit cont 5546 699 GB...
Страница 21: ...21 2x 4x 4x 6x 21 19 20 22 Installation sequence Installing the internal unit cont 5546 699 GB Installation...
Страница 89: ...89 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5546 699 GB Service...
Страница 104: ...104 0010 0009 0007 0002 0004 0008 0001 0005 0003 0006 Parts lists internal unit Casing internal unit cont 5546 699 GB...
Страница 165: ...165 5546 699 GB...
Страница 166: ...166 5546 699 GB...
Страница 167: ...167 5546 699 GB...