63
For further information regarding the individual steps, see the page indicated
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
1. Opening the heat pump
.................................................. 65
•
2. Compiling reports
........................................................... 65
•
3. Purging the refrigerant lines and the internal unit with
nitrogen (internal unit is filled with nitrogen; positive
pressure approx. 2 bar/0.2 MPa)
•
4. Tightness and pressure test with dry nitrogen at
43 bara/4.3 MPa
•
5. Evacuating the refrigerant lines and internal unit
....... 66
•
6. Charging the refrigerant lines and internal unit
.......... 69
•
•
•
7. Checking the refrigerant circuit for tightness
.............. 70
•
8. Filling and venting the secondary side
........................ 71
•
9. Filling and venting the solar circuit
.............................. 73
•
•
•
10. Checking expansion vessel and heating circuit
pressure
........................................................................... 73
•
11. Cleaning the DHW cylinder
............................................ 73
•
12. Replacing the magnesium anode
.................................. 75
•
•
13. Checking electrical connections of the internal unit
for firm seating
•
•
•
14. Checking the free running of the fan in the external
unit
................................................................................... 75
•
15. Cleaning the external unit heat exchanger
(evaporator)
..................................................................... 75
•
16. Checking thermal insulation of flared connections
•
•
17. Checking electrical connections of the external unit
for firm seating
................................................................ 76
•
•
•
18. Closing the heat pump; resetting the circuit breaker/
main fuse
•
•
•
19. Starting the heat pump
................................................... 77
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5546 699 GB
Service
Содержание AWT-AC 241.A04
Страница 19: ...19 SLP N 9 11 aCH sG lJ 10 Installation sequence Installing the internal unit cont 5546 699 GB Installation...
Страница 20: ...20 X20 2x 16 17 2x 12 14 18 13 15 Installation sequence Installing the internal unit cont 5546 699 GB...
Страница 21: ...21 2x 4x 4x 6x 21 19 20 22 Installation sequence Installing the internal unit cont 5546 699 GB Installation...
Страница 89: ...89 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5546 699 GB Service...
Страница 104: ...104 0010 0009 0007 0002 0004 0008 0001 0005 0003 0006 Parts lists internal unit Casing internal unit cont 5546 699 GB...
Страница 165: ...165 5546 699 GB...
Страница 166: ...166 5546 699 GB...
Страница 167: ...167 5546 699 GB...