61
6.6
Setting of parameters before the equipment start-up
Parameters necessary for equipment start-up
Before you make a fire you must set following parameters:
Parameter
Description
Units
Set by the
manufacturer
P 20
Fuel type
1
P 238
Year
-
P 239
Date
-
P 240
Time
-
These parameters are necessary for equipment start-up and other parameters can be modified as need may
be or after the discussion with the technician.
Setting P 238 – 240 parameters is important for the boiler operation in time regimes. If the supply outage
lasts longer than approx. 3 days (it depends on the number of regulator operating hours) set current time a
date after the supply restoration.
Note:
We recommend checking the time periods for warm water and heating circuit (see table no. 7 and 8). These
parameters can be modified by customer as need may bet. Three time periods can be used.
Parameters modification according to the type of heated building
Parameter
Description
Units
Set by the
manufacturer
P 80
Building constant
[h]
10
P 86
Heating system
3
In case HW heating is not used set 0 at P 42 parameter. HW heating will be ignored also in case of
connected HW sensor. HW sensor fault will not be signalled.
6.7
Boiler commissioning
1. Making fire in the boiler.
−
Connect the equipment to the mains (insert plug into the socket).
−
Put the main switch (circuit breaker) in the service box into the 1 position.
−
Check whether QAA 88 device is switched off or switch it off by means of OK key; cursor will move
into ON/OFF position. QAA 88 device will be switched off.
−
Check setting of parameters see chap. 6.6.
−
On the pressure gauge check volume of water in heating system.
−
Open the stop valves between boiler and heating system.
−
Check the pumps functionality (mechanical spinning, then according to parameters: primary pump (P
50, P 51), pump HC (P 55, P 56), pump HW (P 59, P 60)).
−
Clean the burner and ash-pan drawer (in case fire isn’t made for the first time). Ash-pan door during
fire making and boiler operation must be permanently closed.
−
Fill the fuel reservoir with specified fuel and then close the reservoir carefully in order to prevent
possible air intake into the burner through the feeder.
−
By pressing the green button on the service box put the fuel feeder for fuel feed to burner manually
into operation. Fuel must be supplied approx. 2 cm under the edge of the cast iron grate. In case twe
start with an empty fuel feeder the fuel transport to burner will last 6 – 6,5 min. After 6 minutes the
feed screw is automatically switched off and if required then by pressing the green button again it is
put into operation. By pressing the green button again the fuel feeder is switched off.
−
Put the kindling e.g. paper, wood chips, PEPO, solid alcohol etc. on the fuel.
−
Ignite and let flare up.
−
Shovel a small volume of specified fuel to the burning kindling.
−
Close the door and switch on the ventilator by means of blue button in the service box (the ventilator
run is signalled by flickering cursor above the ventilator symbol). Through the door the fuel flaring can
be checked. As necessary the ventilator can be switched off by pressing the blue button and if it be to
the contrary the ventilator is automatically switched off after 15 minutes. When making fire the
Содержание VULCANUS
Страница 1: ...Hercules U26 Návod k obsluze VULCANUS MANUAL FOR BOILER OPERATION AND INSTALLATION ...
Страница 19: ...19 5 2 2 Shells assembly Fig no 12 Boiler shell ...
Страница 27: ...27 Fig no 18 VULCANUS boiler left hand design ...
Страница 70: ...70 ...
Страница 72: ...72 Update 17 2013 GB model 2013 ...