Table of content:
page
1.
Boiler usage and advantages ......................................................................................................................3
2.
Boiler technical data ....................................................................................................................................3
3.
Description ...................................................................................................................................................7
3.1
Boiler construction ................................................................................................................................7
4.
Positioning and installation ..........................................................................................................................9
4.1
Rules and regulations ...........................................................................................................................9
4.2
Positioning possibilities.......................................................................................................................11
4.3
Hydraulic connection diagram ............................................................................................................13
5.
Boiler installation........................................................................................................................................16
5.1
Delivery and accessories ...................................................................................................................16
5.2
Installation procedure .........................................................................................................................17
5.2.1
Installation of boiler drum with the basement ..............................................................................17
5.2.2
Shells assembly ..........................................................................................................................19
5.2.3
Fuel reservoir assembly ..............................................................................................................21
5.2.4
Mounting of the service board to the fuel reservoir .....................................................................22
5.2.5
Mounting of cleaning tools ..........................................................................................................22
5.2.6
Assembly of the emergency fire extinguishing equipment ..........................................................23
5.2.7
Boiler conversion from right-hand design to the left-hand design ...............................................23
5.2.8
Wiring diagram ............................................................................................................................28
6.
Boiler operation by user .............................................................................................................................32
6.1
Control, regulation and security elements ..........................................................................................32
6.1.1
Saphir regulator ...........................................................................................................................32
6.1.2
Safety thermostat ........................................................................................................................36
6.1.3
Temperature sensor on the fuel feeder ......................................................................................36
6.1.4
Emergency fire-extinguishing system .........................................................................................36
6.1.5
Forced withdrawal of superfluous heat .......................................................................................36
6.2
SAPHIR regulator parameters............................................................................................................36
6.2.1
Description of SAPHIR regulator parameters .............................................................................45
6.3
QAA 88 device ...................................................................................................................................54
6.3.1
Parameters setting and displaying ..............................................................................................55
6.3.2
Faults ..........................................................................................................................................58
6.4
Service board .....................................................................................................................................59
6.5
Checking activities before commissioning .........................................................................................60
6.6
Setting of parameters before the equipment start-up.........................................................................61
6.7
Boiler commissioning .........................................................................................................................61
6.8
HMI (ACX84.910/ALG) service unit for Saphir regulator operation ....................................................62
6.9
Superior control ..................................................................................................................................63
7.
IMPORTANT CAUTIONS ..........................................................................................................................63
8.
Maintenance ..............................................................................................................................................64
9.
Instructions for product disposal after its service life .................................................................................65
10.
Guarantee and liability for defects .........................................................................................................65
Содержание VULCANUS
Страница 1: ...Hercules U26 Návod k obsluze VULCANUS MANUAL FOR BOILER OPERATION AND INSTALLATION ...
Страница 19: ...19 5 2 2 Shells assembly Fig no 12 Boiler shell ...
Страница 27: ...27 Fig no 18 VULCANUS boiler left hand design ...
Страница 70: ...70 ...
Страница 72: ...72 Update 17 2013 GB model 2013 ...