44
Parameter
Description
Units
Set by the
manufacturer
Range
Resolution
P 216
Feeder X4 pellets
[%]
100
100
0
P 217
Feeder Y4 pellets – 4 sect.
[s]
14
4 … 26
1
Feeder Y4 pellets – 5 sect.
[s]
12
5 … 50
1
Feeder Y4 pellets – 6 sect.
[s]
10
5 … 50
1
Feeder Y4 pellets – 7 sect.
[s]
8
5 … 50
1
P 218
Feeder runtime in the attenuation – pellets
[s]
15
13 … 20
1
P 219
Standstill time(delay) feeder in the
attenuation – pellets
[min.]
10
5 … 15
1
P 220
Ventilator X1 pellets
[%]
0
0
0
P 221
Ventilator Y1 pellets – 4 sect.
[%]
6
4 … 15
1
Ventilator Y1 pellets – 5 sect.
[%]
10
5 … 50
1
Ventilator Y1 pellets – 6 sect.
[%]
14
5 … 50
1
Ventilator Y1 pellets – 7 sect.
[%]
20
5 … 60
1
P 222
Ventilator X2 pellets
[%]
33
33
0
P 223
Ventilator Y2 pellets – 4 sect.
[%]
16
10 … 25
1
Ventilator Y2 pellets – 5 sect.
[%]
22
5 … 60
1
Ventilator Y2 pellets – 6 sect.
[%]
24
5 … 60
1
Ventilator Y2 pellets – 7 sect.
[%]
35
5 … 70
1
P 224
Ventilator X3 pellets
[%]
66
66
0
P 225
Ventilator Y3 pellets – 4 sect.
[%]
26
18 … 40
1
Ventilator Y3 pellets – 5 sect.
[%]
38
10 … 70
1
Ventilator Y3 pellets – 6 sect.
[%]
42
10 … 70
1
Ventilator Y3 pellets – 7 sect.
[%]
48
10 … 80
1
P 226
Ventilator X4 pellets
[%]
100
100
0
P 227
Ventilator Y4 pellets – 4 sect.
[%]
35
25 … 45
1
Ventilator Y4 pellets – 5 sect.
[%]
42
30 … 60
1
Ventilator Y4 pellets – 6 sect.
[%]
48
35 … 75
1
Ventilator Y4 pellets – 7 sect.
[%]
60
40 … 85
1
P 228
Ventilator slowing-down in the attenuation
regime– pellets
[s]
3
1 … 60
1
P 229
Ventilator output in the attenuation – pellets
[%]
100
50 … 100
1
P 231
Superior control OFF/ON
0
0 … 1
1
P 232
Outside sensor deactivation
1
0 … 1
1
P 233
Diagnostics HC
-
-
-
P 234
Diagnostics boiler
-
-
-
P 235
Restoration of manufacturer’s setting
0
0 … 1
1
P 238
Year
-
2000 - 2050
1
P 239
Date
-
01.01. – 31. 12.
Day
P 240
Time
-
00:00 – 23:59
Minute
Содержание VULCANUS
Страница 1: ...Hercules U26 Návod k obsluze VULCANUS MANUAL FOR BOILER OPERATION AND INSTALLATION ...
Страница 19: ...19 5 2 2 Shells assembly Fig no 12 Boiler shell ...
Страница 27: ...27 Fig no 18 VULCANUS boiler left hand design ...
Страница 70: ...70 ...
Страница 72: ...72 Update 17 2013 GB model 2013 ...