20
Legend to Fig.No. 12:
1.
Boiler drum with basement
2.
Left side part of basement shell
3.
Safety thermostat holder
4.
Safety thermostat
5.
Screw M4 x 6 (2 pcs)
6.
Screw ST 4,8 x 13 (2 pcs)
7.
Insulation of left side part of basement shell
8.
Insulation into cut-out
9.
Right side part of basement shell
10. Bushing PG 13,5 (2 pcs)
11. Insulation of left side part of basement shell
12. Washer 8,4 (4 pcs)
13. Nut M8 (4 pcs)
14. Screw ST 4,8 x 13 (4 pcs)
15. Front lower part of shell
16. Front lower part of the shell insulation
17. Front upper part of shell
18. Front upper part of the shell insulation (sibral)
19. Front upper part of the shell insulation (rotaflex)
20. Rear lower part of shell
21. Screw ST 4,2 x 9,5 (4 pc)
22. Left side part of the shell
23. Side part of the shell insulation
24. Grommet Heyco
25. Junction stud (2 pc)
26. Washer 10,5 (1 pc)
27. Draw rod of smoke control
28. Control mechanism lever
29. Washer 10,5 (1 pc)
30. Plug
∅
3 x 25 (1 pc)
31. Lock 2,5 x 32 (1 pc)
32. Bakelite ball
33. Right side part of the shell
34. Side part of the shell insulation
35. Junction stud (2 pcs)
36. Screw ST 4,8 x 13 (6 pcs)
37. Face
38. Face insulation (rotaflex)
39. Face insulation (sibral)
40. Upper part of the shell
41. Spring clip (4 pcs)
42. Upper part of the shell insulation
43. Front part of the shell
44. Front part of the shell insulation (rotaflex)
45. Front part of the shell insulation (sibral)
46. Rear part of the shell upper insulation
47. Rear part of the shell
48. Screw ST 4,8 x 13
49. Rear part of the shell insulation
50. Stopper of keg Ø 52.5 mm
51. Cover
52. Screw ST 4,8 x 13 (4 pcs)
1.
Remove the shell from the cardboard package.
2.
Mount the relevant connection accessories on the steel sheet components according to Fig. no. 12.
3.
Jacket the VULCANUS boiler according to Fig. no. 12.
4.
Screw the safety thermostat (2 pc screw M4 x 6) to the safety thermostat holder. Screw the holder with
the safety thermostat to the left shell of basement (2 pc screw ST 4,8 x 13) – see detail A. (Note: lead
the safety thermostat capillary between the shell and insulation). The electric connection of safety
thermostat is done before jacketing the boiler. The cable goes in the bushing through the side part of the
basement shell depending on the design either in the left or right part of basement shell. The boiler
output temperature sensor must be positioned in the boiler basin across the bushing in the side part of
the basement shell (depending on the right or left design) also before the boiler jacketing.
5. Mount the left and right side part of basement shell incl. insulation. Depending on the left or right design
selection break out the steel sheet for feeder connection. Screw the cover by means of 4 screws ST 4.8 x
13 to a part of the cut out hole. Grip the side parts to the basement by means of M8 nuts and 8,4
washers (only to the front part of the basement).
6.
Mount the front parts of basement shell incl. insulation (upper and lower) and screw the rear part of
basement shell to the side parts of basement shell.
7.
Mount the left and right side part of shell incl. insulation to the anchor screws (screw the junction studs
into both side parts of shells and mount the HEYCO bushings in the left shell).
8.
Pull the smoke control draw rod through the left side part of the shell and secure by a plug. Mount the
smoke control lever on the draw rod and secure by means of 2 pc washers and plugs. Connect the
smoke control lever with smoke adapter flap and secure with a lock; the screw the bakelite ball
9.
Stick the label for signalling the smoke flap on the left-hand side part of the shell at the point of smoke
control draw rod.
10. Mount the front part of the shell incl. insulation.
11. Screw the rear part of the shell to the side parts.
12. Seat the face with insulation on the side parts.
13. Insert the spring clips into the upper part of shell with insulation and mount on junction studs of shell side
parts.
Содержание VULCANUS
Страница 1: ...Hercules U26 Návod k obsluze VULCANUS MANUAL FOR BOILER OPERATION AND INSTALLATION ...
Страница 19: ...19 5 2 2 Shells assembly Fig no 12 Boiler shell ...
Страница 27: ...27 Fig no 18 VULCANUS boiler left hand design ...
Страница 70: ...70 ...
Страница 72: ...72 Update 17 2013 GB model 2013 ...