16
5.
Boiler installation
5.1
Delivery and accessories
VIADRUS HERCULES DUO boiler based on the order is delivered in such a way that the complete
boiler drum including the basement is put on the pallet and packed boiler shell is gripped at the side
of it. The accessories are put inside the boiler drum and are accessible after opening the cleaning
door. The fuel reservoir (depending on the requirement small – 269 dm
3
or large – 528 dm
3
) including
the fuel feeder set is put on another pallet. The boiler is packed in transport package and must not be
tipped over during the transport.
Standard boiler delivery:
•
boiler drum with basement
•
fuel feeder set
•
fuel reservoir
•
service board SIMBOX WP 8GB1 373-3 – set incl. electric pack
•
QAA 88 device
•
ventilator
•
connector for fan plug + socket
•
round head screw and cross-recessed screw M6 x 16 (4 pc) for ventilator gripping to the feeder flange
washer 6,4 (4 pc) to ventilator gripping to the feeder flange
•
nut M6 (4 pc) to ventilator gripping to the feeder flange
•
Safety thermostat
•
round head screw and cross-recessed screw M4 x 6 (2 pc) for safety thermostat gripping
•
boiler drum shell
•
connection accessories for boiler drum shell (spring clip – 4 pc, junction stud – 4 pc,
screw ST4,8 x 13 – 10 pc)
•
basement shell
•
connection accessories for basement shell (screw ST 4,2 x 9,5 – 4 pc, screw ST 4,8 x 13 – 8pc)
•
connection accessories for basement shell gripping to the basement (washer 8,4 – 4 pc, nut M8 – 4 pc)
•
ash-pan
•
boiler mastic – tube 310 ml
•
bushings PG 13,5 (2 pc)
•
bushings PG 11 (2 pc)
•
stud bolt M10 x 30 (4 pc) and washers 10 (4 pc) for gripping the fuel feeder set to the basement
•
hexagon head screws M8 x 20 (4 pc) and washers 8 (4 pc) for gripping the fuel reservoir to the fuel
feeder
•
filling and drain tap Js 1/2“ (1 pc)
•
plug Js 6/4“ blind (1 pc)
•
sealing
φ
60 x 48 x 2 (1 pc)
•
hook (1 pc)
•
deflector (1 pc)
•
ceramics into the boiler drum (5 pcs)
•
partitions of the combustion chamber (4 sections - 2 pcs, 5 sections - 3 pcs, 6 sections - 4 pcs, 7
sections - 5 pcs)
•
turbulators (8 pcs)
•
draw rod with hanaccording to for smoke flap control (1 pc)
•
grommet HEYCO (2 pc)
•
label for smoke flap control (1 pc)
•
flange of heating and return water 2“ (2 pc)
•
sealing
φ
90 x 60 x 3 (2 pc)
•
handling key (1 pc)
•
cleaning tools (hook, brush with hanaccording to, tang, dowel 8 mm – 2 pc, straight threaded rivet 5x60 –
2 pc)
•
siseal 10 g
•
thermostatic valve BVTS (Danfoss) or TS 130 (Honeywell) or STS 20 (Watts)
•
cast iron grate (see tab. no. 5)
•
boiler sensor QAZ 36.526/109
•
sensor against fuel fire penetration QAZ 36.526/109
•
outside sensor QAC 34/101 (necessary for the full and basic version for equithermal control)
•
thermostatic valve (filling valve) - series VTC312 (external thread) made by ESBE (minimum temperature
of return water is 45
o
C) (ord. code: 5100 15 00) - for 4 sect.
•
thermostatic valve (filling valve) - series VTC512 (external thread) made by ESBE (minimum temperature
of return water is 45
o
C) (ord. code: 5100 15 00) - for 5 - 7 sect.
Содержание VULCANUS
Страница 1: ...Hercules U26 Návod k obsluze VULCANUS MANUAL FOR BOILER OPERATION AND INSTALLATION ...
Страница 19: ...19 5 2 2 Shells assembly Fig no 12 Boiler shell ...
Страница 27: ...27 Fig no 18 VULCANUS boiler left hand design ...
Страница 70: ...70 ...
Страница 72: ...72 Update 17 2013 GB model 2013 ...