17
5.2
Installation procedure
Fig.
№
. 9
Connecting dimensions of the boiler
5.2.1
Installation of the boiler drum with the basement
1.
Position the boiler drum with the basement on the substructure (pad) at the horizontal position.
2.
Connect the heating water outlet and the heating system.
3.
Connect the return water outlet and the heating system.
4.
Mount the discharge valve into the hole at the rear part of the basement.
6.
Put the smoke pipe to the smoke adapter and insert into chimney hole. Smoke pipe diameter is 160 mm.
7.
It is recommended to install shut-off valves before and after the pump with a filter, for the reason of cleaning
the filter strainer or replacement of the pump.
8.
Open the cleaning door (Fig. 3 – pos. 6) and place 2 fireclay top plates (see Fig. 11 - pos. 6).
9.
Open the cleaning door (see Fig. 3 – pos. 5) and place 11 turbulators (see Fig. 11 - pos. 8), 2 lower ceramics
(pos. 7) and 2 fireclay top plates (see Fig. 11 - pos. 6).
10. Seal the grate with the boiler mastic. The cutting of the grate must be always directed to the input of fuel
feeder.
11. Place the air inlet tube on the burner (pos. 5).
12. Slide the ash rectifier (pos. 3.)
Fig.
№
. 10
!
Apply boiler mastic to the marked point and put the
grate on the retort with the mixer. It is necessary to
ensure tightness between the burner and grate.