SERVICE INFORMATION
Vertical Express Product Manual
5-29
88500 v.1.0
Service Information Section
Card Changing Procedures
CPU Replacement
Back Up the Job Software
1. Place the controller on Inspection Operation.
2. Insert the manufacturing-supplied USB flash drive into the USB Host Port (CON6
on the existing CPUC Card). Most USB flash drives may be used, if they are prop-
erly formatted and have the correct file folder structure. See USB Flash Drive
Preparation on page 5-34.
Transferring software between the CPUC and USB flash drives requires a
few minutes to complete. Resetting the card during this time could
result in corrupting the USB and the CPUC.
3. Issue a UDLS Command. This process will backup the generic and job
configuration files to the USB flash drive.
Controller UIT: Block Select Adjustments > Commands Upload > UDLS.
Replace the CPUC Card
1. Turn OFF, Lockout, and Tagout the mainline disconnect.
2. Unplug CON40 from the IOF Card.
3. Unplug the Ethernet cable (if used) from CON5 of the CPUC Card.
4. Set jumper positions on the replacement CPUC Card to match the faulty CPUC
Card.
5. Confirm that all LEDs on the IOF Card are not illuminated.
6. Carefully uninstall the faulty CPUC Card. Take care not to bend the pins that join
the CPUC to the IOF Card, CON1 of the CPUC Card.
7. Remove the UIT and standoffs from the faulty CPUC Card.
The UIT Card is bound to the specific job configuration (software) for the job. The UIT
Card will not permit the adjustment of any other job.
During replacement:
•
Do Not Swap UIT Cards between controllers/CPU Cards.
•
Remove the UIT Card from the failed CPUC Card.
8. Install the UIT and standoffs on the replacement CPUC Card.
9. Carefully install the replacement CPUC Card onto the IOF Card. Before applying
pressure, ensure that CON1 of the CPUC properly aligns with the IOF Card's mat-
ing pins.
Содержание ICON 32
Страница 1: ...Controller...
Страница 3: ...INSTALLATION SECTION...
Страница 4: ...INSTALLATION SECTION...
Страница 39: ...ADJUSTMENT SECTION...
Страница 40: ...ADJUSTMENT SECTION...
Страница 42: ...2 2 Vertical Express Printed in USA April 2020 Contents Adjustment Section This page intentionally left blank...
Страница 83: ...DIAGNOSTICS SECTION...
Страница 84: ...DIAGNOSTICS SECTION...
Страница 86: ...3 2 Vertical Express Printed in USA April 2020 Contents Diagnostics Section This page intentionally left blank...
Страница 131: ...TROUBLESHOOTING SECTION...
Страница 132: ...TROUBLESHOOTING SECTION...
Страница 134: ...4 2 Vertical Express Printed in USA April 2020 Contents Troubleshooting Section This page intentionally left blank...
Страница 165: ...SERVICE INFORMATION SECTION...
Страница 166: ...SERVICE INFORMATION SECTION...
Страница 168: ...5 2 Vertical Express Printed in USA April 2020 Contents Service Section This page intentionally left blank...
Страница 205: ...REFERENCE SECTION SERVICE REFERENCE SECTION...
Страница 206: ...REFERENCE SECTION...
Страница 208: ...5R 2 Vertical Express Printed in USA April 2020 Contents Reference Section This page intentionally left blank...