29
107774-02- 4/18
Option
5
6
7
8
Illustrated in Figure
7.15, 7.17 7.17, 7.18
7.17
7.17
Pipe
Penetration
through
Structure
Vent
Roof
Roof
Roof
Roof
Intake
Roof
Roof
Roof
Roof
Material
Vent
CPVC/
PVC
(Note 2)
DuraVent
PolyPro
(Rigid)
Selkirk
Polyflue
Centro-
therm
InnoFlue
SW
Intake
PVC
PVC
PVC
PVC
Nominal
Diameter
Vent
3”
3”
3”
3”
Intake
3”
3”
3”
3”
Min Equivalent Vent Length:
Models
135
12”
12”
12”
12”
150
52”
52”
52”
52”
180
52”
52”
52”
52”
Max Equivalent Vent Length (Note 1):
Models
135
135ft
135ft
135ft
135ft
150
135ft
135ft
135ft
135ft
180
135ft
135ft
135ft
135ft
Terminal Option H
(Fittings)
Vent
Coupling
w/Screen
3PPS-12B
or
3PPS-36B
w/Screen
3PF-10UV
or
3PF-39UV
w/Screen
ISEP03 or
ISEP0339
w/Screen
Intake 180 Elbow
w/Screen
180 Elbow
w/Screen
180 Elbow
w/Screen
180 Elbow
w/Screen
Terminal Option I
(Ipex FGV Concentric)
Ipex
196006
(Note 3)
Not Permitted
Terminal Option J
(DiversiTech CVENT
Concentric)
CVENT-3
Not Permitted
Terminal Option K
(DuraVent Vertical
Concentric)
Not
Permitted
3PPS-VK
Not Permitted
Notes:
1. Max vent lengths shown also apply to the intake. For example, Vent Option #1 may have up to 135ft of vent pipe and also
up to 135 ft of intake pipe.
2. First 30” of vent and vent Elbow connected to boiler must be CPVC. Downstream vent pipe can be PVC except as noted in
text.
3. Ipex FGV Concentric Terminal available in various lengths and also CPVC (see text).
All vertical terminals require compatible roof flashing and storm collars.
VII. Venting
C. Design Requirements Unique to Vertical Venting Systems (continued)
Table 7.13a: Summary of Vertical Twin Pipe Venting Options
Содержание K2WTC-135
Страница 10: ...10 107774 02 4 18 Figure 4 1 Minimum Clearances To Combustible Construction IV Locating the Boiler continued...
Страница 12: ...12 107774 02 4 18 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued...
Страница 74: ...74 107774 02 4 18 Figure 9 2 Piping Method 1 Near Boiler Piping Heating Only IX System Piping continued...
Страница 76: ...76 107774 02 4 18 Figure 9 5 Piping Method 1 Near Boiler Piping Shaded Boiler Loop IX System Piping continued...
Страница 81: ...81 107774 02 4 18 X Domestic Hot Water Piping continued Figure 10 1 Domestic Hot Water Piping...
Страница 87: ...87 107774 02 4 18 Figure 11 6 J3 Field Wiring Figure 11 5 4 20 mA EMS Field Wiring XI Wiring continued...
Страница 89: ...89 107774 02 4 18 XI Wiring continued...
Страница 90: ...90 107774 02 4 18 Figure 11 8 Internal Wiring Connections Diagram XI Wiring continued...
Страница 92: ...92 107774 02 4 18 Figure 11 9 TACO SR504 or Equivalent Zone Panel Wiring Connection Diagram XI Wiring continued...
Страница 93: ...93 107774 02 4 18 Figure 11 10 Sage Zone Control Circulator Panel Wiring Connection Diagram XI Wiring continued...
Страница 101: ...101 107774 02 4 18 Lighting and Operating Instructions XII Start Up and Checkout continued...
Страница 142: ...142 107774 02 4 18 XVI Repair Parts continued...
Страница 145: ...145 107774 02 4 18 XVI Repair Parts continued...
Страница 148: ...148 107774 02 4 18 XVI Repair Parts continued...
Страница 150: ...150 107774 02 4 18 XVI Repair Parts continued...
Страница 152: ...152 107774 02 4 18 XVI Repair Parts continued 120 121 122 123 124 125 126 127...
Страница 159: ...159 107774 02 4 18 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 160: ...160 107774 02 4 18 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...