22
107774-02 - 4/18
B. Design Requirements Unique to Horizontal Twin Pipe Venting Systems
Table 7.5 summarizes all horizontal twin pipe vent options. Illustrations of horizontal twin pipe vent systems are
shown in Figures 7.6 – 7.10. In addition to the requirements in Section VII - A, observe the following design
requirements:
1. Permitted Terminals for Horizontal Venting:
Terminal Option A: Fittings (Acceptable for Vent Options 1-4) – Vent terminates in a plain end (coupling for PVC,
bell end for PolyPro, Polyflue and plain end pipe for InnoFlue). Intake terminates in a PVC 90 sweep elbow
pointing down. Outer edge of both terminals must be within 10” of the wall surface (Figures 7.6, 7.9). The section
of DuraVent PolyPro, Centrotherm InnoFlue or Selkirk Polyflue exposed to the outdoors must be UV resistant.
Use of rodent screens (not supplied) is generally recommended for both terminations. These can be fabricated
from 2 x 2 (1/2” mesh) stainless steel screen. Rodent screens and are installed as shown in Figure 7.28. Rodent
screens (“bird guards”) for PolyPro, InnoFlue and Polyflue are as follows:
Size/Vent System Rodent Screen (“Bird Guard”)
3” PolyPro
DuraVent # 3PPS-BG
3” Polyflue
Selkirk # 3PV-HVST
3” InnoFlue
Centrotherm # IASPP03
If necessary to achieve required clearance above grade, CPVC or CPVC/PVC vent systems may be terminated
using fittings on snorkels as shown in Figure 7.12. When this is done, the equivalent length of all pipe on the
exterior of the building, except for the terminal fittings themselves, must be counted when calculating the
equivalent length. The maximum vertical run of the snorkel is 7 feet. Brace both the vent and inlet piping if
required. PolyPro, InnoFlue and Polyflue may not be snorkeled.
Terminal Option B: Ipex Low Profile Terminal (Acceptable for Vent Option 1) – This terminal is shown in Figure
7.7. If the terminal is oriented vertically (alternate orientation shown in Fig 7.7) the exhaust opening must be
on the top as shown. See Section VII - E of this manual and the Ipex instructions provided with the terminal, for
installation details.
Terminal Option C: DiversiTech “Low Profile” Terminal (Acceptable for Vent Option 1) – This terminal is shown in
Figure 7.7. If the terminal is oriented vertically (alternate orientation shown in Fig 7.7) the exhaust opening must
be on the top as shown. See Section VII - E of this manual and the DiversiTech instructions provided with the
terminal, for installation details.
Terminal Option D: Ipex FGV Concentric Terminal (Acceptable for Vent Option 1) - This terminal is shown in
Figure 7.8 and may be used with CPVC/PVC vent systems. This terminal is available in various lengths and in
both PVC and CPVC. Terminals acceptable for use with these vent options are as follows:
Ipex PN
FGV Concentric Terminal Description
196006
3 x 20” PVC
196106
3 x 32” PVC
196116
3 x 44” PVC
197107
3 x 32” CPVC
197117
3 x 44” CPVC
See Section VII - E of this manual and the Ipex instructions provided with the terminal, for installation details.
Terminal Option E: DiversiTech Concentric Terminal (Acceptable for Vent Option 1) - This terminal is shown in
Figure 7.8 and may be used with CPVC/PVC vent systems. See Section VII - E of this manual and the DiversiTech
instructions provided with the terminal, for installation details.
Terminal Option F: DuraVent PolyPro Concentric Terminal (Acceptable for Vent Option 2) - This terminal is shown
in Figure 7.10 and may be used with DuraVent 3” PolyPro vent systems. See Section VII - F of this manual and
the DuraVent instructions provided with the terminal, for installation details.
VII. Venting
B. Design Requirements Unique to Horizontal Twin Pipe Venting Systems (continued)
Содержание K2WTC-135
Страница 10: ...10 107774 02 4 18 Figure 4 1 Minimum Clearances To Combustible Construction IV Locating the Boiler continued...
Страница 12: ...12 107774 02 4 18 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued...
Страница 74: ...74 107774 02 4 18 Figure 9 2 Piping Method 1 Near Boiler Piping Heating Only IX System Piping continued...
Страница 76: ...76 107774 02 4 18 Figure 9 5 Piping Method 1 Near Boiler Piping Shaded Boiler Loop IX System Piping continued...
Страница 81: ...81 107774 02 4 18 X Domestic Hot Water Piping continued Figure 10 1 Domestic Hot Water Piping...
Страница 87: ...87 107774 02 4 18 Figure 11 6 J3 Field Wiring Figure 11 5 4 20 mA EMS Field Wiring XI Wiring continued...
Страница 89: ...89 107774 02 4 18 XI Wiring continued...
Страница 90: ...90 107774 02 4 18 Figure 11 8 Internal Wiring Connections Diagram XI Wiring continued...
Страница 92: ...92 107774 02 4 18 Figure 11 9 TACO SR504 or Equivalent Zone Panel Wiring Connection Diagram XI Wiring continued...
Страница 93: ...93 107774 02 4 18 Figure 11 10 Sage Zone Control Circulator Panel Wiring Connection Diagram XI Wiring continued...
Страница 101: ...101 107774 02 4 18 Lighting and Operating Instructions XII Start Up and Checkout continued...
Страница 142: ...142 107774 02 4 18 XVI Repair Parts continued...
Страница 145: ...145 107774 02 4 18 XVI Repair Parts continued...
Страница 148: ...148 107774 02 4 18 XVI Repair Parts continued...
Страница 150: ...150 107774 02 4 18 XVI Repair Parts continued...
Страница 152: ...152 107774 02 4 18 XVI Repair Parts continued 120 121 122 123 124 125 126 127...
Страница 159: ...159 107774 02 4 18 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 160: ...160 107774 02 4 18 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...