1
Adjusting the steam volume
Turning the handwheel adjusts the steam volume.
VEIT recommends to open the handwheel by 90°.
2
Control panel
n
panel on standard version’ on page 36
n
Cleaning version
panel on cleaning version’ on page 37
3
Filling nozzle for VEIT SteamClean
VEIT SteamClean can be refilled via the filling
nozzle, if required.
For cleaning version only.
4
Steam pressure
(pressure gauge)
Displays the current boiler pressure.
5
Water filling opening
Feedwater can be refilled via the water filling
opening.
6
Blow-down valve
When opening the blow-down valve, the blow-down
water is discharged during blow-down.
7
Vent valve
If the pump does not supply water, the vent valve
must be opened to vent the pump.
Operation
Controls and indicators
30.09.2022
Steam generator VEIT SG67
35