K465i Operations and Maintenance
P/N 1212831 Rev C
Page 3-41
Copyright
©
2012
Veeco Instruments, Inc. Confidential
All Rights Reserved
Section 3.13.
system Processes
For operations and maintenance of Veeco Turbodisc systems, we provide detailed process
descriptions within the user documentation. The documented system processes include the
following:
System Setups – System Readiness Checklist
Maintenance Shutdown and Bakeout process runs
Wafer Operations - Loading and Unloading, through THA, in/out of RHA
Growth Recipe Development and Implementation
Shutdown Procedures
Decommissioning Guidelines /Shipping Instructions
Routine Maintenance and Troubleshooting
Reactor Chamber Maintenance
Cleaning of Critical System Components
Flow flange Maintenance
Heater Assembly Maintenance
Particle Filter Maintenance
Bubbler/Bath Maintenance
Leak Checking
A sample generic flow diagram of the system maintenance processes is given in