AutoSamplers
Varian, Inc.
User Manual 450-GC
Page: 151
6. Set the switch to the STD (Standard, liquid sample configuration) DOWN-
Position.
7. Raise the sled until you hear a click, this fixes the sled.
8. Install the Liquid Sample syringe holder.
9. Install the Liquid Syringe, in the block. Lock the plunger head and fix the
syringe.
10. Close the cover on the tower and turn on the power to the gas
chromatograph. The gas chromatograph will automatically detect the new
configuration of the switch and will respond accordingly.
11. Recalibrate the sampler , on page 112.
12. Adjust the Injector insert to Liquid Injection.
13. The instrument is now in the Liquid Injection mode.
Fix the plunger head
Mount the liquid
syringe
Fix the syringe
Содержание 450-GC
Страница 92: ...AutoSamplers Page 152 User Manual 450 GC Varian Inc...
Страница 144: ...Detectors Flame Ionization Detector FID Page 294 User Manual 450 GC Varian Inc...
Страница 177: ...Maintenance Page 438 User Manual 450 GC Varian Inc...
Страница 179: ...Shipping Cleaning and Disposal Instructions Page 440 User Manual 450 GC Varian Inc...
Страница 192: ...Replacement Parts Replacement Parts Page Page 456 456 User User Manual Manual 450 GC 450 GC Varian Varian Inc Inc...
Страница 201: ......