User’s Guide ______________________________________________________________________
48 ___________________________________________________________________M211486EN-A
Preparations Just Before Release (2 - 0 Hours)
These preparations must be performed from 2 to 0 hours before the
sounding balloon release.
included in preparing the radiosonde and OIF411 for a sounding with
sounding software MW41 45 minutes before the launch. The steps
below provide more detailed information on the preparations.
Table 11
Workflow for Ozone Sounding Preparations 45
Minutes Before Launch
Time to
Launch in
Minutes
Ozone Sensor Interface
OIF411
Radiosonde
RS41
Sounding
Software MW41
Balloon and
Accessories
45
Select battery
type and any
supplemental
heat source
needed, based
on the previous
flight’s
performance.
Attach interface
board to pump
frame.
Attach
radiosonde
holder to
styrofoam flight
box.
Start MW41
software.
Fill the balloon
and attach the
detainer/
unwinder/
parachute.
30
Start running
the ECC on
zero ozone air
using an
external power
supply for the
pump motor.
Activate and
condition
radiosonde.
Configure
software for the
ozone flight.
20
Record
background
current.
Connect
interface to
RS41.
Record
background
current.
15
Connect
battery to
ozone sensor
pump (activate
battery if
needed), and
heater battery,
if required.
Attach
radiosonde to
the flight box.
Prepare the
radiosonde for
flight. Put ECC
into to flight box if
it is not there yet
(for prewarming
in cold weather
flights).
10
Take the
ozonesonde
construction
outside to
acclimatize and
record surface
ozone.
Check telemetry
data.
Attach
radiosonde to the
balloon.
0
Check telemetry
data.
Release the
balloon.
Содержание RS41
Страница 1: ...USER S GUIDE Ozone Sounding with Vaisala Radiosonde RS41 M211486EN A ...
Страница 124: ...www vaisala com M211486EN ...