User’s Guide ______________________________________________________________________
32 ___________________________________________________________________M211486EN-A
Set up the vacuum/pressure gauge as shown in
0106-008
Figure 12
Vacuum/Pressure Gauge
Set up the pump unit following the steps below:
1.
Insert connector tube 1 into the locking nut (see number 3 in
2.
Push the tube over the tip of the connection screw on the gauge
(number 1).
3.
Gently tighten the locking nut over the connector tube onto the
gauge (number 2).
Connection tube 3: cut a piece of tubing from EEC
sensor air inlet tubes to a length of approximately 3 cm,
or order separately.
17348S (by the
meter) or SPC
spare part No.
OTU-19
The following numbers refer to
:
1
=
Gauge and connection screw
2
=
Locking nut
3
=
Connector tube 1
4
=
Connector tube 2
5
=
Connector tube 3
Table 7
Equipment Required for Pump Test
Unit (Continued)
Item Required
Vaisala Part
Number
Содержание RS41
Страница 1: ...USER S GUIDE Ozone Sounding with Vaisala Radiosonde RS41 M211486EN A ...
Страница 124: ...www vaisala com M211486EN ...