COMMISSIONING
64
Assembly instructions
Requirements:
Clean and tidy workplace.
Required tools:
⚒
Tape measure
⚒
Drill
Assembly steps:
1. Position the drilling device on the point of the conductor line where you intend to
mount the fixpoint.
NOTICE!
►
Do not drill through the contact surface of the conductor rail!
►
Before starting to drill, check the conductor rail protrusion (copper profile) on both
sides. The conductor rail must protrude by 7.5 mm on both sides.
2. With help of the drilling device, drill through the insulating housing and the back
of the conductor line.
3. Press the fixpoint clamps into the previously drilled holes and align them with the
recesses of the hangers.
4. Now mount the conductor line in the hanger as usual.
5.3.11
Expansion joints
NOTICE!
►
Expansion joints are always delivered pre-assembled!
►
Observe hanging distances!
►
The mounting clip serves to fix the expansion joint during assembly and is included
in the scope of delivery!
CAUTION!
►
Only remove the mounting clip once the entire line has been assembled. Other-
wise the expansion joint is compressed and proper function is no longer guaran-
teed.
Содержание VCL Series
Страница 95: ...INDEX 93 U Unloading 88...
Страница 96: ...CE Technical Documentation...