COMMISSIONING
58
Step 4
Assembly instructions:
1. Mount the next conductor system in the intended
hanger as described in Chapter: "5.3.3 ".
Step 5
Required tools:
⚒
Plastic hammer
Assembly instructions:
1. Hammer the conductor system up to the stop us-
ing the plastic hammer.
NOTICE!
Repeat these steps until you have reached the penul-
timate 4-meter section. Determine the exact length to
the end point and adapt the last sections accordingly.
5.3.6
Renewing conductor rail joints
Assembly/disassembly steps
⚒
Cutting tool
⚒
Deburring tool
1. Detach the conductor line from the rail holder so
that it is possible to use the cutting tool.
2. Cut out the connection point.
3. Reestablish the required overhang of the conduc-
tor rail to the insulating housing.
4. Deburr the cut edges.
5. Mount new connector with connecting cap, see
Chapter: „5.3.5 “.
Содержание VCL Series
Страница 95: ...INDEX 93 U Unloading 88...
Страница 96: ...CE Technical Documentation...