D292105.7b.fm
Load the Bowl Feeder
Chapter 4: Setup
4- 5
Load the Bowl Feeder
1.
To prepare the
Bowl Feeder
for operation, ensure the correct
Bowl
and
Linear
Track
are installed for the part which will be run.
2.
Load the
Bowl
with parts. Do not overfill.
3.
On the HMI, select
Bowl
from the tab menu on the left to open the
Bowl Setup
Tab
..
4
.
Enable the
Linear Vibratory
. The
Linear Track
will turn on and activate the
Bowl
5.
Manually adjust the
Vibratory Controls
for
Linear Track
and
Bowl
as needed to
suit the type of component that is being processed. Parts should move fluidly into
the track and on to the nest.
Step 3:
Load the
Bowl Feeder
Содержание TM-402
Страница 4: ......
Страница 72: ...3 30 TM 403 User s Guide Run Tab D292105 6a fm...
Страница 156: ...6 12 TM 403 User s Guide Preparing to Run a Pre programmed Job D292105 8b fm...
Страница 197: ...Appendix A Sensors Contents Keyence FS N11CVP FS N12CP Sensor Amplifiers A 2 SMC ZSE30 Vacuum Sensor A 4...
Страница 202: ...Appendix A Sensors A 6 SMC ZSE30 Vacuum Sensor D291842 11 fm...
Страница 294: ......
Страница 298: ...751 Summit Avenue Mankato MN 56001 507 387 2039 FAX 507 387 2257 www vtekusa com Email info vtekusa com...