D292105.8b.fm
Preparing to Run a Pre-programmed Job
Chapter 6: Operation
6- 7
Setup the Taper
1.
Load the correct carrier tape and cover
tape, adjusting the track width as
necessary.
2.
Select
PSA
or
Heat
seal.
3.
Align cover tape with carrier tape.
4.
Run a pull test and adjust seal strength
as needed.
5.
Place an empty reel onto the take-up
reel spindle.
6.
Use the
Continuous Advance
button on the
Taper Tab
to run out the tape until it
can be attached to the reel.
The tape normally can be attached by inserting it into the reel hub or with blue
Permacel tape.
Step 4:
Setup
Taper
Содержание TM-402
Страница 4: ......
Страница 72: ...3 30 TM 403 User s Guide Run Tab D292105 6a fm...
Страница 156: ...6 12 TM 403 User s Guide Preparing to Run a Pre programmed Job D292105 8b fm...
Страница 197: ...Appendix A Sensors Contents Keyence FS N11CVP FS N12CP Sensor Amplifiers A 2 SMC ZSE30 Vacuum Sensor A 4...
Страница 202: ...Appendix A Sensors A 6 SMC ZSE30 Vacuum Sensor D291842 11 fm...
Страница 294: ......
Страница 298: ...751 Summit Avenue Mankato MN 56001 507 387 2039 FAX 507 387 2257 www vtekusa com Email info vtekusa com...