D292105.8b.fm
Preparing to Run a Pre-programmed Job
Chapter 6: Operation
6- 11
Run the Job
1.
Close the enclosure doors, then open the HMI
Run Tab
and press
Run
.
During operation, the operator will add additional parts to the
Bowl Feeder
and
unload packaged parts from the
Taper
as necessary. The operator may also
replace parts that fail 2D Inspection. Otherwise no other adjustments are required
for a job that has already been defined properly.
2.
When the preset number of parts has been run, the TM-402 will automatically stop
operation.
Note:
If
Leader
has been
ENABLED
, the
Taper
will continue to seal tape until it
reaches the programmed
Leader
length. If
Leader
is
DISABLED
, the
Taper
will
continue to seal tape until the last sealed part has reached the cut point.
3.
Cut the sealed tape at the cut point and use a piece of blue Permacel tape to
secure the finished reel. Remove processed output.
Step 8:
Run
Job
Содержание TM-402
Страница 4: ......
Страница 72: ...3 30 TM 403 User s Guide Run Tab D292105 6a fm...
Страница 156: ...6 12 TM 403 User s Guide Preparing to Run a Pre programmed Job D292105 8b fm...
Страница 197: ...Appendix A Sensors Contents Keyence FS N11CVP FS N12CP Sensor Amplifiers A 2 SMC ZSE30 Vacuum Sensor A 4...
Страница 202: ...Appendix A Sensors A 6 SMC ZSE30 Vacuum Sensor D291842 11 fm...
Страница 294: ......
Страница 298: ...751 Summit Avenue Mankato MN 56001 507 387 2039 FAX 507 387 2257 www vtekusa com Email info vtekusa com...