179
APPENDIX E — UPC OPEN CONTROLLER (cont)
Configuring the BAS Port for BACnet MS/
TP —
Use the same baud rate and communication settings
for all controllers on the network segment. The UPC Open
controller is fixed at 8 data bits, No Parity, and 1 Stop bit for
this protocol's communications.
If the UPC Open controller has been wired for power, pull
the screw terminal connector from the controller's power termi-
nals labeled Gnd and HOT. The controller reads the DIP
Switches and jumpers each time power is applied to it.
Set the BAS Port DIP switch DS3 to “enable.” Set the BAS
Port DIP switch DS4 to “E1485.” Set the BMS Protocol DIP
switches DS8 through DS5 to”MSTP.” See Table F.
Table F — SW3 Protocol Switch Settings
for MS/TP
Verify that the EIA-485 jumpers below the CCN Port are set
to EIA-485 and 2W.
The example in Fig. J shows the BAS Port DIP Switches set
for 76.8k (Carrier default) and MS/TP.
Set the BAS Port DIP Switches DS2 and DS1 for the appro-
priate communications speed of the MS/TP network (9600,
19.2k, 38.4k, or 76.8k bps). See Fig. I and Table G.
Table G — Baud Selection Table
Wiring the UPC Open Controller to the MS/TP
Network —
The UPC Open controller communicates using
BACnet on an MS/TP network segment communications at
9600 bps, 19.2 kbps, 38.4 kbps, or 76.8 kbps.
Wire the controllers on an MS/TP network segment in a dai-
sy-chain configuration. Wire specifications for the cable are
22 AWG (American Wire Gage) or 24 AWG, low-capacitance,
twisted, stranded, shielded copper wire. The maximum length
is 2000 ft.
Install a BT485 terminator on the first and last controller on
a network segment to add bias and prevent signal distortions
due to echoing. See Fig. H, J, and K.
To wire the UPC Open controller to the BAS network:
1. Pull the screw terminal connector from the controller's
BAS Port.
2. Check the communications wiring for shorts and
grounds.
3. Connect the communications wiring to the BAS port’s
screw terminals labeled Net +, Net -, and Shield.
NOTE: Use the same polarity throughout the network
segment.
4. Insert the power screw terminal connector into the UPC
Open controller's power terminals if they are not current-
ly connected.
5. Verify communication with the network by viewing a
module status report. To perform a module status report
using the BACview keypad/display unit, press and hold
the “FN” key then press the “.” Key.
DS8
DS7
DS6
DS5
DS4
DS3
Off
Off
Off
Off
On
Off
BAUD RATE
DS2
DS1
9,600
Off
Off
19,200
On
Off
38,400
Off
On
76,800
On
On
Fig. I — DIP Switches
a48-8580
Fig. J — Network Wiring
Содержание Carrier Weathermaker 48A2
Страница 105: ...105 Fig 20 Typical Main Control Box Wiring Schematic 48 50A2 A3 A4 A5 Units...
Страница 106: ...106 Fig 21 Typical Auxiliary Control Box Wiring Schematic...
Страница 107: ...107 Fig 22 Typical 2 Stage Gas Heat Wiring Schematic Size 060 Units Shown a48 8357...
Страница 108: ...108 TO NEXT PAGE Fig 23 Typical Staged Gas Heat Wiring Schematic Size 060 Units Shown A48 7296...
Страница 109: ...109 Fig 23 Typical Staged Gas Heat Wiring Schematic Size 060 Units Shown cont A48 8358...
Страница 110: ...110 Fig 24 Typical Electric Heat Control Schematic 50 Series Size 060 Units Shown a50 8228...
Страница 111: ...111 Fig 25 Typical Power Schematic 48 50A2 A3 A4 A5 060 Unit Shown...
Страница 112: ...112 Fig 26 Typical Low Ambient Controls Option Wiring...
Страница 113: ...113 Fig 27 Typical Small Chassis Component Location Size 020 035 Units...
Страница 114: ...114 Fig 28 Typical Large Chassis Component Locations Size 040 060 Units...
Страница 118: ...118 Fig 30 Economizer Control Board ECB1 and VAV Control Board ECB2 A48 7706...
Страница 142: ...142 A48 3733 Fig 56 Main Burner Removal...
Страница 176: ...176 APPENDIX C VFD INFORMATION cont Fig F Internal Enclosure Fan Replacement A48 7716...