
Manual CWD 2005
Installation
___________________________________________________________________
Manual CWD2005.doc
29
4.5.
Gas connections
All gas connections should be leak tested before use. Tube compression fittings are
normally supplied and up to 5 gas connections are possible if all options including
process gas, 2 calibration gases, carrier gas and fast loop are specified.
4.5.1. Process gas filters
Two types of gas filters are recommended. Natural gas and other clean gases need a
filter with small internal volume. Filter elements need to be changed occasionally and
a pressure gauge can
be used to check filter “back pressure”. The mA hold function
can be activated before the filter change to provide a continuous output signal during
filter maintenance. Be sure to cancel memory hold after use.
Figure 9: Small filter
1
Input
¼” (6 mm) Gyrolok
2
Output
¼” (6 mm) Gyrolok
3
Removable element cap
4
Filter body 316 SS
5
Filter 20-30 m
Dirty gases need a filter with a larger volume and this will increase dead time.
Figure 10: Filter with drain connection
1
Filter inlet
2
Filter way
3
Inlet
¼” (6 mm) Gyrolok
4
Outlet
¼” (6 mm) Gyrolok
5
Filter 99,8% at 0,1 m
6
Filter cap
7
Filter housing 316 SS
(7) Filter volume: 23 cm³ (0.00081 ft³ or 1.4 cu. inches)