USER MANUAL — 200-9011-ENG R1
69
PREVENTIVE MAINTENANCE
A preventive maintenance is required annually for this equipment. This maintenance program is based on a
normal use. Preventive maintenance frequency shall be increased if required. A minimum of one (1) annual
verification of all items of the
Preventive maintenance annual checklist
(page 70) is recommended.
WARNING
• Only trained and authorized personnel shall perform preventive maintenance and servicing on this
equipment. If not avoided, situation could result in personal injury or permanent equipment damage.
•
Only trained and qualified personnel shall perform preventive maintenance and servicing on this equipment.
If not avoided, situation could result in electrical or electronic misconnection and lead to shock or fire
hazards.
IMPORTANT
Batteries have an intended lifetime of 5 years and should be replaced after 5 years or sooner, depending on
battery backup usage.
If device is left unplugged for a long period, batteries will slowly drain. Do not fully drain batteries.
Batteries should be charged every 3 months. Plug the bed to a supply main with protective ground or to a hospital
grade outlet that is protectively grounded for a minimum of 6 hours.
Ensure that battery is properly charged prior to perform the preventive maintenance verification. If applicable,
secure any bed section that would have to be lifted during servicing procedures.
!
Содержание ook "snow" all 200-0000
Страница 1: ...2 0 1 8 0 7 2 0 0 9 0 1 1 E N G R 1 User manual 200 0000 ALL...
Страница 2: ......
Страница 3: ...2 0 1 8 0 7 2 0 0 9 0 1 1 E N G R 1 User manual 200 0000 ALL...
Страница 20: ......
Страница 74: ......