Quick Installation
*Move on to Section 5 about an
operation.
The system installation is ended!
CRYOPUMP
Inspection
COMPRESSOR UNIT
Inspection
ACCESSORIES
Inspection
Install cryopump to vacuum
equipment
a. Connect roughing system
b. Connect regeneration gas
purge unit
c. Connect exhaust duct
*Carry out b and c if needed.
・
Connect the cryopump to the compressor unit with flexible hoses.
・
Check the followings.
a. Filling pressure in the compressor unit
b. Temperature and flow rate of cooling water
c. Flow rates of purge gas and dilution gas if supply-lines for those gases are
required for regeneration process.
・
For remote operation, both remote and response wirings are necessary.
Connect cooling water piping
・
Connect refrigerator power cable from the cryopump to the compressor unit
・
Connect input power cable of the compressor unit to main power source.
・
Check the followings.
a. Input voltage
b. Connection of ground line
Figure 3-1.
Quick Installation Process Flow
3-2
ULVAC CRYOGENICS INCORPORATED
Содержание CRYO-U12H
Страница 2: ......
Страница 8: ...F 6 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Страница 24: ...This page intentionally left blank S 12 ULVAC CRYOGENICS INCORPORATED...
Страница 26: ...IW 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Страница 46: ...Installation 4 10 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Страница 60: ...Regeneration 6 8 ULVAC CRYOGENICS INCORPORATED This page intentioanlly left blank...
Страница 64: ...Disconnection and Storage 7 4 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Страница 78: ...Maintenance 8 14 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Страница 86: ...Troubleshooting A 8 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Страница 88: ...Flexible Hose B 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Страница 100: ...CS 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...