
-3- SCREEN PP45
24/29
1.10.17 MONITORING
From these screens you can monitor the time it takes the machine to make all
movements to facilitate optimizing the cycle time.
In the first screen we have times of the forming module, then sealing, cuttings
and the last the overall machine time.
1.10.18 PRODUCTION
From the screen control panel and clicking the right arrow we have the
parameters of cycle counters.
Содержание TFS100
Страница 2: ......
Страница 4: ......
Страница 14: ......
Страница 16: ......
Страница 18: ...2 USE INSTRUCTIONS TFS 100 2 38 8 1 FILM COIL STORAGE AND TRANSPORT 37 8 2 INSERTION OF PRODUCTS IN TRAYS 38...
Страница 26: ...2 USE INSTRUCTIONS TFS 100 10 38...
Страница 28: ...2 USE INSTRUCTIONS TFS 100 12 38 3 8 ELECTRONIC CABINET...
Страница 40: ...2 USE INSTRUCTIONS TFS 100 24 38...
Страница 48: ...2 USE INSTRUCTIONS TFS 100 32 38 GREASERS 9372726 GREASE CUP Lubrication points...
Страница 56: ......
Страница 58: ...3 SCREEN PP45 2 29...
Страница 82: ...3 SCREEN PP45 26 29...