
-2- USE INSTRUCTIONS TFS 100
14/38
4.2 FILM COIL INSERTION
Once the machine is connected, we must insert the film coils in order to begin to
work. The dimensions and characteristics of the coils are specified in the drawing given
to the customer.
LOWER FILM COIL INSERTION
Insert the coil in its mandrel and place the reed on
the coil support centred with respect to the setting rings.
Next to the working surface of the machine, there is
a diagram indicating the film flow until the input roll. In order
to ease the introduction of the film when you install a new
coil, there is an advancement button at the input end of the
machine, on the coil support.
At the film inlet roll, grips are open. Insert the film
between them and make it pass through the winders
according to the scheme. When you push the advancement
button, the grips will hold the film and drag it. Be careful so that the beginning of the
film does not encounter any supporting bar.
If the film is complex, only one of the faces will be the welding face. This face
must be upwards. All the coils have this face identified.
Lower roll-holder
Содержание TFS100
Страница 2: ......
Страница 4: ......
Страница 14: ......
Страница 16: ......
Страница 18: ...2 USE INSTRUCTIONS TFS 100 2 38 8 1 FILM COIL STORAGE AND TRANSPORT 37 8 2 INSERTION OF PRODUCTS IN TRAYS 38...
Страница 26: ...2 USE INSTRUCTIONS TFS 100 10 38...
Страница 28: ...2 USE INSTRUCTIONS TFS 100 12 38 3 8 ELECTRONIC CABINET...
Страница 40: ...2 USE INSTRUCTIONS TFS 100 24 38...
Страница 48: ...2 USE INSTRUCTIONS TFS 100 32 38 GREASERS 9372726 GREASE CUP Lubrication points...
Страница 56: ......
Страница 58: ...3 SCREEN PP45 2 29...
Страница 82: ...3 SCREEN PP45 26 29...