
34
HYDRAULIC WINDSHIELD SYSTEM HWS
STEP
DESCRIPTION
DIAGRAM
3
Assembly of the SECTIONS:
Join the “VERTICAL WALER” to the “MAST” with these elements:
Orthogonal Joint MK.
Profiles MK-120
Reinforcement diagonals: Special tubes or Push-Pull Props E.
“
Self-Climbing Blocks”
must be placed with the block facing the
opposite direction of the VERTICAL WALER.
It is very important to follow the assembly drawings to ensure
the right distances between elements.
4
Assembly of the Screen SUPPORT:
Place 2 SECTIONS at the required distance.
Check the assembly drawings to verify the position of the
sections.
Place and fix the “Timber Beams VM20” which are used as the
SUPPORT for the “Protection Screen”.
5
Assembly of the SCREEN:
Finally, cover the protection screen with plywood.
Other alternatives (metallic nets…) could be used to cover the
panel. Fixation will be different depending on the case. For more
information check the Project Design Guide HWS.
The HWS set is assembled. Refer to the process of “Placing on the
building”” described in point 3.2.