
23
HYDRAULIC WINDSHIELD SYSTEM HWS
After fixing the “Head” into the “Slab Bracket”
check the folowing points:
1- The 2 “Red Positioning Pins” are correctly positioned
and blocked with its respective cotter pins R/3
2- The “Double Pin” of the “Head LT HWS” is correctly
positioned and locked with the “Cotter Pin R/3”.
3- The “Head LT HWS” rest vertically on the lower part
of the “Slab Bracket LT HWS” and horizontally in the
horizontal support. NEVER suport vertically the
“Head” on the horizontal support.
In the next example the complete exploded of the “Slab
Bracket LT HWS” is shown.
Insert the “Head”
laterrally
2
Pull the “Head” along
untill it reaches the pin
of the other side
lón posicionador del
esquina opuesta
3
Reposition the “Red
Positioning Pin” and the
cotter pin R/3
4
Slab Bracket LT HWS
(1991171)
Bolt M24x140 DIN931-10.9 (0242414)
Head LT HWS
(1991169)
Cone DW15/M24 (1901080)
Tie Rod DW15
Fix Anchor DW15 (0230005)
The 2 "Red Positioning
Pins" correctly positioned
NO Vertical Support
at the Horizontal Support
Vertical support
of the head
Double Pin
Fixed