4.3 DISASSEMBLY AND INSPECTION (Reference)
4.4 OPERATION (Reference)
1)Neutral position
In the neutral position,convensater
spool(711) in open(Unload),Main spool(311)
and check valve(511,531) is closed and its
pressure is enough to rest the force of lift arm..
Circuit diagram in the neutral position
9-25
Fig.9-44
Содержание T233 HST
Страница 14: ...1 11...
Страница 15: ...1 12...
Страница 22: ...SECTION 3 GEAR TRAIN DIAGRAMS FIG 1 3 GEAR TRAIN DIAGRAM 1 19...
Страница 33: ...SECTION 2 OPERATION CHART FOR DISASSEMBLY AND REASSEMBLY BY MAJOR BLOCKS 2 4...
Страница 60: ...3 HST main pump case 4 5...
Страница 64: ...6 Hydrostatic system schematic 4 8...
Страница 100: ...3 Rear transmission case 5 15 Fig 5 23...
Страница 121: ...Power Train Diagram Fig 5 60 5 36...
Страница 210: ...SECTION 6 WIRING DIAGRAM 10 12...