SECTION 6 – OPERATIONAL TEST AND PLACE IN SERVICE
PAGE 6-6 REV. 0 2014-MAY-02
CHECKFIRE 210
Detection and Actuation System
TABLE 6-2: ISOLATION FEATURE (External or Dual Power Only) (Continued)
9. Confirm successful release signal (Pass) on RCT.
10. Reset DCT to “Normal” position.
11. Reset RCT.
12. Cancel Isolate Mode by returning the Isolate switch to the
normal position.
13. Reset to Normal: Press and hold “DELAY/Reset/
Silence” button for 3 seconds; Green and Red LEDs are
steady-on for 1 second; then Amber LEDs are steady-on
for 1 second; at end sounder quickly pulses 3 times.
TABLE 6-3: OPERATIONAL TEST
The following tests verify system operation for:
1. Circuit Supervision: Confirm supervisory function of each
circuit.
2. Detection Circuit Input: Receive electrical signal from a
detection device on #1 and #2 detection circuits (simu-
lated fire condition).
3. Time Delay: Verify accuracy of time delay programming.
4. Spot Thermal Detectors: Verify contact closure.
5. Electric Manual Activation: Receive electrical signal from
an EMA.
If noted results are not attained, refer to Section 9 – Trouble-
shooting for corrective action.
NOTICE
If the system is connected to a vehicle/equip-
ment shutdown device through the pressure
switch, verification needs to be made at the
pressure switch.
NOTICE
During testing, verify any devices connected
to Relay #1 and Relay #2 function as intended.
CAUTION
Before performing any operational test(s), protect the fire
suppression system from unintentional actuation. Verify
Electric-Pneumatic Actuators are not connected to Release
Circuit Drop Cables and any pneumatic manual actuators are
ring-pinned for safety and/or actuation cartridges removed.
CAUTION
When performing any operational testing, make certain the
RCT (Part No. 441021) and Release Circuit Test Plug(s)
(Part No. 440912) are attached to the release circuit.
RESET RCT,
DCT, AND
ISOLATE
SwITCH
RESET TO
NORMAL
DISPLAY
MODULE
POWER LED
IS GREEN
STEADY-ON
009277
Содержание ANSUL CHECKFIRE 210
Страница 2: ......
Страница 6: ...REVISION RECORD PAGE 2 REV 0 2014 MAY 09 NOTES CHECKFIRE 210 Detection and Actuation System...
Страница 12: ...SECTION 1 SYSTEM DESCRIPTION PAGE 1 4 REV 0 2014 MAY 02 NOTES CHECKFIRE 210 Detection and Actuation System...
Страница 26: ...SECTION 2 COMPONENTS PAGE 2 14 REV 0 2014 MAY 02 CHECKFIRE 210 Detection and Actuation System NOTES...
Страница 34: ...SECTION 3 USER INTERFACE PAGE 3 8 REV 0 2014 MAY 02 NOTES CHECKFIRE 210 Detection and Actuation System...
Страница 46: ...SECTION 4 SYSTEM PLANNING PAGE 4 12 REV 0 2014 MAY 02 NOTES CHECKFIRE 210 Detection and Actuation System...
Страница 108: ...SECTION 7 IN CASE OF FIRE PAGE 7 2 REV 0 2014 MAY 02 NOTES CHECKFIRE 210 Detection and Actuation System...