SECTION 6 – OPERATIONAL TEST AND PLACE IN SERVICE
2014-MAY-02 REV. 0 PAGE 6-17
CHECKFIRE 210
Detection and Actuation System
TABLE 6-4: INTERNAL POwER ONLY – OPERATIONAL TEST
Systems Using Internal Power Only
1. Power LED pulses GREEN 1 x 3 seconds.
2. Complete the following tests (pages 6-9 thru 6-16) with
system on internal power:
• Detection Circuit: Alarm Condition Test
• Detection Circuit: Test Time Delay Restart
• Field Test Spot Thermal Detectors
• Manual Activation Release Circuit Test
• Electric Manual Actuator (EMA) Test
Note: For above tests the Power LED continues to pulse
GREEN 1 x 3 seconds.
Note: If battery is low, Power LED pulses Amber 1 x 10
seconds.
009290
INTERNAL POwER
TESTING
GREEN LED PULSES
1 X 3 SECONDS
REPEAT TESTS
PAGES 6-8 –6-15 ON
INTERNAL POWER
Содержание ANSUL CHECKFIRE 210
Страница 2: ......
Страница 6: ...REVISION RECORD PAGE 2 REV 0 2014 MAY 09 NOTES CHECKFIRE 210 Detection and Actuation System...
Страница 12: ...SECTION 1 SYSTEM DESCRIPTION PAGE 1 4 REV 0 2014 MAY 02 NOTES CHECKFIRE 210 Detection and Actuation System...
Страница 26: ...SECTION 2 COMPONENTS PAGE 2 14 REV 0 2014 MAY 02 CHECKFIRE 210 Detection and Actuation System NOTES...
Страница 34: ...SECTION 3 USER INTERFACE PAGE 3 8 REV 0 2014 MAY 02 NOTES CHECKFIRE 210 Detection and Actuation System...
Страница 46: ...SECTION 4 SYSTEM PLANNING PAGE 4 12 REV 0 2014 MAY 02 NOTES CHECKFIRE 210 Detection and Actuation System...
Страница 108: ...SECTION 7 IN CASE OF FIRE PAGE 7 2 REV 0 2014 MAY 02 NOTES CHECKFIRE 210 Detection and Actuation System...