Contents
6
5816,0013US / Version 02
Transport and storage ........................................................ 33
Safety .......................................................................... 33
Transport inspection.................................................... 34
Transport..................................................................... 34
Storage........................................................................ 35
Assembly and installation .................................................. 36
Safety .......................................................................... 36
Required steps ............................................................ 36
Foundation and empty conduits.................................. 37
Foundation and empty conduits
for the barrier ............................................... 38
Unpacking ................................................................... 40
Open barrier housing .................................................. 41
Assemble housing....................................................... 42
Check assembly and installation................................. 43
Electrical connection .......................................................... 44
Safety .......................................................................... 44
Installing electrical protective devices......................... 46
Connecting the mains supply...................................... 47
Connecting safety loops and /
or safety scanners ....................................... 50
Connecting safety loop ................................ 51
Connecting testable safety devices
and test them ............................................... 52
Connecting emergency opening contacts ... 52
Digital inputs ................................................ 52
Digital outputs and output relays ................. 53
Checking the electrical connection ............................. 53
Assembling flange and barrier arm................................... 54
Safety .......................................................................... 54
Mount the barrier arm and the anchor support ........... 58
Start-up and operation........................................................ 62
Safety ..................................................................... 62
Commissioning............................................................ 63
Switching on and off the barrier .................................. 64
Opening and closing the barrier manually .................. 65
Putting the barrier temporarily out of operation .......... 66
Traffic H1 Swing Gate Horizontal Barrier
www.TURNSTILES.us | [email protected] | 303-670-1099
Содержание Traffic H1
Страница 89: ...Traffic H1 Swing Gate Horizontal Barrier www TURNSTILES us patrick mcallister TURNSTILES us 303 670 1099...
Страница 94: ......
Страница 96: ......
Страница 98: ......