Assembly and installation
40
5816,0013US / Version 02
2.
Place reinforcement grid pursuant to Fig. 10 in the foundation
hole.
3.
Place empty conduits pursuant to Fig. 9 in the foundation
hole.
4.
Close empty conduits to prevent water from entering.
5.
Fill concrete foundation pursuant to Fig. 8.
6.
Create flat line in the base area. The following requirements
must be fulfilled:
Level and horizontal.
Surface deviation: max. 0.00732 in/ft
2
(2 mm/m
2
)
7.
Let concrete cure.
8.
Apply moisture protection agent to concrete surface.
NOTE!
We recommend applying moisture protection either
in the form of sealing sludges such as 1100 Hansit
or ready-made solution such as Sikagard
®
703 W
or deepdry
®
to the concrete surface before housing
assembly. Moisture protection prevents entering of
moisture into the housing from the concrete floor.
7.4
Unpacking
The individual packages are packed according to the expected
transport conditions. Only environment-friendly materials have
been used for the packaging.
The packaging should protect the individual components against
transport damages, corrosion, etc up to the assembly. Therefore
do not destroy the packaging and remove only directly before
assembly.
1.
Unpack
barrier.
2.
Set up barrier housing vertically.
3.
Lay down barrier arm.
4.
Unpack and lay out accessories.
5.
Separate material according to type and size and recycle
them after use.
Traffic H1 Swing Gate Horizontal Barrier
www.TURNSTILES.us | [email protected] | 303-670-1099
Содержание Traffic H1
Страница 89: ...Traffic H1 Swing Gate Horizontal Barrier www TURNSTILES us patrick mcallister TURNSTILES us 303 670 1099...
Страница 94: ......
Страница 96: ......
Страница 98: ......