![Trox Technik X-CUBE Скачать руководство пользователя страница 87](http://html1.mh-extra.com/html/trox-technik/x-cube/x-cube_transport-and-installation-manual_1172434087.webp)
Recuperator
Spa
The
heat
exchanger
5
6.
Assembling
procedure
The
2
modules
are
supplied
pre
‐
assembled
in
a
single
pallet.
Take
off
the
damper/s
from
the
packing
box.
According
to
selected
model,
damper/s
could
be
fixed
on
the
top
or
fixed
on
the
lateral
side
of
the
pallet.
Assembling plate heat exchangers
Air handling unit X-CUBE
87