3.
Place the slings (Fig. 8/4) around the ends of the transport tubes.
Position slings between the base frame (Fig. 8/6) and the screws (Fig. 8/2).
that are thick enough to provide a distance of 100 mm between the sling and the casing unit.
Spread the slings near the roof with a suitable device (Fig. 8/7), e.g. a lifting beam.
Note:
Do not spread slings by more than 60°.
Ensure that the slings cannot damage the AHU casing unit.
Suspend (distribute) the load symmetrically, i.e. in such a way that its centre of gravity is beneath the crane
hook.
NOTICE!
Risk of damage to property due to the incorrect handling or lifting of units!
Take proper precautions when you use a crane to move or lift parts or components of an air handling unit
as otherwise they may be damaged.
–
Protect the edges of the AHU casing units with wood blocks.
–
Spread the slings (wire ropes or chains) near the roof with a suitable device, e.g. a lifting beam.
4.
Slowly lift the load and start moving.
3.4 Storage and functional integrity
3.4.1 Storage
NOTICE!
Risk of damage to property due to corrosion!
Insufficient ventilation due to film packaging can
result in condensation and, hence, oxidation on
galvanised surfaces, e.g. white rust.
–
Remove film packaging immediately after
delivery.
–
Store all units in a dry, well-ventilated place.
In the case of Sendzimir-galvanised units, corrosion
may occur on the cut edges. Reddish or whitish dis-
colouration of the cut edge does not indicate prob-
lematic corrosion. Corrosion protection is still guar-
anteed. This does not indicate a reduction in quality
and there are no grounds for complaint.
Please note the following storage conditions:
Do not store outdoors.
Store in a dry and dust-free place that is not
exposed to sunlight.
Storage temperature: -10 °C to +50 °C; avoid
sudden/major fluctuations in temperature.
Provide unpackaged units with protective packaging
and ensure sufficient ventilation in order to prevent
condensation.
Seal openings in the units to ensure that no dust or
vermin can get inside.
Do not expose the units to aggressive operating
fluids.
The storage location must be level and have suffi-
cient load-bearing capacity.
If storing the units for more than 3 months, refer to
the information on functional integrity,
Note!
If there are storage instructions on the packaging,
these instructions must be followed as well.
3.4.2 Functional integrity of the unit com-
ponents
When storing or shutting down the units or if commis-
sioning is to be carried out at a later date (units out of
operation for more than 3 months), take the following
measures to ensure their functional integrity.
Rotating or moving components such as fans, rotary
heat exchangers, multileaf dampers, actuators,
valves or pumps should be rotated/moved on a
monthly basis.
In the case of belt-driven components, slacken the
belts.
Check the general condition of all parts and of the
packaging. Refresh corrosion protection, if neces-
sary.
Document any measures taken.