40
CAUJ-SVX01E-EN
W
WA
AR
RN
NIIN
NG
G
P
Prro
op
pe
err F
Fiie
elld
d W
Wiirriin
ng
g a
an
nd
d G
Grro
ou
un
nd
diin
ng
g
R
Re
eq
qu
uiirre
ed
d!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w cco
od
de
e cco
ou
ulld
d rre
essu
ulltt iin
n d
de
ea
atth
h o
orr
s
se
erriio
ou
us
s iin
njju
urry
y..
A
Allll ffiie
elld
d w
wiirriin
ng
g M
MU
US
ST
T b
be
e p
pe
errffo
orrm
me
ed
d b
by
y q
qu
ua
alliiffiie
ed
d
p
pe
errs
so
on
nn
ne
ell.. IIm
mp
prro
op
pe
errlly
y iin
nsstta
alllle
ed
d a
an
nd
d g
grro
ou
un
nd
de
ed
d
ffiie
elld
d w
wiirriin
ng
g p
po
osse
ess F
FIIR
RE
E a
an
nd
d E
EL
LE
EC
CT
TR
RO
OC
CU
UT
TIIO
ON
N
h
ha
azza
arrd
dss.. T
To
o a
av
vo
oiid
d tth
he
esse
e h
ha
azza
arrd
dss,, y
yo
ou
u M
MU
US
ST
T ffo
ollllo
ow
w
rre
eq
qu
uiirre
em
me
en
nttss ffo
orr ffiie
elld
d w
wiirriin
ng
g iin
ns
stta
alllla
attiio
on
n a
an
nd
d
g
grro
ou
un
nd
diin
ng
g a
as
s d
de
essc
crriib
be
ed
d iin
n N
NE
EC
C a
an
nd
d y
yo
ou
urr llo
occa
all//
s
stta
atte
e e
elle
eccttrriicca
all cco
od
de
ess..
N
NO
OT
TIIC
CE
E
U
Us
se
e C
Co
op
pp
pe
err C
Co
on
nd
du
uc
ctto
orrs
s O
On
nlly
y!!
F
Fa
aiillu
urre
e tto
o u
usse
e cco
op
pp
pe
err cco
on
nd
du
uc
ctto
orrss cco
ou
ulld
d rre
essu
ulltt iin
n
e
eq
qu
uiip
pm
me
en
ntt d
da
am
ma
ag
ge
e a
ass u
un
niitt tte
errm
miin
na
allss a
arre
e n
no
ott
d
de
es
siig
gn
ne
ed
d tto
o a
acccce
ep
ptt o
otth
he
err tty
yp
pe
ess o
off c
co
on
nd
du
ucctto
orrss..
See
“Power Wire Sizing and Protection Devices,” p. 40
for field connection wire ranges for main power
terminal block 1TB1.
See Electrical Data tables for unit electrical data. The
electrical service must be protected from over current
and short circuit conditions in accordance with NEC
requirements. Protection devices must be sized
according to the electrical data on the nameplate.
•
See Calculation — MCA, MOP, and RDE in
“Wiring
Requirements,” p. 39
section to determine the
following:
–
Electrical service wire size based on Minimum
Circuit Ampacity (MCA),
–
Maximum Overcurrent Protection (MOP) device.
–
Recommended Dual Element fuse size (RDE).
•
A field supplied disconnect switch must be installed
at or near the unit in accordance with the National
Electrical Code (latest edition). See Calculation —
Disconnect Switch Sizing (DSS) in
“Wiring
Requirements,” p. 39
section to determine the
correct size.
•
Complete the unit’s power wiring connections onto
either the main terminal block 1TB1, or the factory
mounted non-fused disconnect switch 1S1, inside
the unit control panel. Refer to the customer
connection diagram that shipped with the unit for
specific termination points.
•
Provide proper supply power (with over current
protection) to the Compressor unit and Air Handling
unit (“No Control”,“VAV”, and “Constant Volume”)
applications. For chilled water systems, provide a
properly sized power supply to the circulating
pump motor (EVP control applications). Be certain
that these components are properly grounded.
•
Provide proper grounding for the unit in accordance
with local and national codes.
Power Wire Sizing and Protection Devices
Table 14.
CAUJ power wire selections
Units
Sizes
(tons)
Voltage
To Main Terminal Block 1T1
Terminal
Block Size
(amps)
Connector
Wire Range
20 to 60
All
175
(1) #14-2/0
80 to 120
All
175
(1) #12-2/0
Table 15.
Control wire selections
Units Sizes
(tons)
Wire
Gauge
Ohms per
1000 feet
Max Wire
Length (ft)
All
18
8
500
All
16
5
1000
All
14
3
2000
All
12
2
3000
Table 16.
Control terminal blocks
Unit Size
Control Terminal Blocks
20 to 60
1TB2
80 to 120
1TB4
Equations
To correctly size main power wiring for the unit, use
appropriate calculation(s) listed below.
L
Lo
oa
ad
d D
De
effiin
niittiio
on
nss ffo
orr C
Ca
allccu
ulla
attiio
on
ns
s
•
LOAD 1: Current of largest motor (compr or fan
motor)
•
LOAD 2: Sum of the currents of all remaining
motors
•
LOAD 4: Control panel transformer and any other
load rated at 1A or more
C
Ca
allc
cu
ulla
attiio
on
n —
— M
MC
CA
A,, M
MO
OP
P,, a
an
nd
d R
RD
DE
E
•
M
MC
CA
A = (1.25 x LOAD 1) + LOAD 2 + LOAD 4
•
M
MO
OP
P = (2.25 x LOAD 1) + LOAD 2 + LOAD 4
Select a fuse rating equal to the MOP value. If the MOP
value does not equal a standard fuse size as listed in
NEC 240 - 6, select the next lower standard fuse rating.
N
No
otte
e:: If selected MOP is less than the MCA, then select
the lowest standard maximum fuse size which is
equal to or larger than the MCA, provided the
selected fuse size does not exceed 800 amps.
•
R
RD
DE
E = (1.5 x LOAD 1) + LOAD 2 + LOAD 4
Select a fuse rating equal to the RDE value. If the RDE
value does not equal a standard fuse size as listed in
NEC 240 - 6 select the next higher standard fuse rating.
N
No
otte
e:: If the selected RDE is greater than selected MOP
value, select RDE value to equal MOP value.
IIn
ns
stta
alllla
attiio
on
n E
Elle
ec
cttrriic
ca
all
Содержание CAUJ-C20
Страница 57: ...CAUJ SVX01E EN 57 W Wi ir ri in ng g D Di ia ag gr ra am ms s...
Страница 58: ...58 CAUJ SVX01E EN N No ot te es s...
Страница 59: ...CAUJ SVX01E EN 59 N No ot te es s...