4
© February 2007 TOSHIBA TEC CORPORATION All rights reserved
e-STUDIO167/207/237
GENERAL OPERATION
4 - 11
4.4
Flow Chart
4.4.1
Immediately after the power is turned ON
Fig. 4-3
NO
NO
YES
YES
YES
YES
NO
NO
"C21"
NO
YES
YES
YES
Heater lamp ON
DC power ON
Scan motor ON
Main switch ON
Call for service
Restart
Paper jam
Call for service
"C26"
"E03"
A
B
ADU sensor ON?
Peak detected?
Exit sensor ON?
Home position
detected?
13 - 15 seconds
elapsed?
Registration sensor
ON?
Cover is open?
Содержание E-Studio167
Страница 8: ...e STUDIO167 207 237 February 2007 TOSHIBA TEC CORPORATION All rights reserved CONTENTS 4 ...
Страница 54: ...e STUDIO167 207 237 February 2007 TOSHIBA TEC CORPORATION All rights reserved OUTLINE OF THE MACHINE 2 38 ...
Страница 68: ...e STUDIO167 207 237 February 2007 TOSHIBA TEC CORPORATION All rights reserved COPY PROCESS 3 14 ...
Страница 92: ...e STUDIO167 207 237 February 2007 TOSHIBA TEC CORPORATION All rights reserved CONTROL PANEL 5 10 ...
Страница 132: ...e STUDIO167 207 237 February 2007 TOSHIBA TEC CORPORATION All rights reserved LASER OPTICAL UNIT 8 8 ...
Страница 142: ...e STUDIO167 207 237 February 2007 TOSHIBA TEC CORPORATION All rights reserved DRIVE UNIT 9 10 ...
Страница 192: ...e STUDIO167 207 237 February 2007 TOSHIBA TEC CORPORATION All rights reserved DRUM RELATED SECTION 11 22 ...
Страница 214: ...e STUDIO167 207 237 February 2007 TOSHIBA TEC CORPORATION All rights reserved DEVELOPMENT SYSTEM 12 22 ...
Страница 260: ...e STUDIO167 207 237 February 2007 TOSHIBA TEC CORPORATION All rights reserved POWER SUPPLY UNIT 15 8 ...
Страница 264: ...e STUDIO167 207 237 February 2007 TOSHIBA TEC CORPORATION All rights reserved PC BOARDS 16 4 8 PWA F ADU Fig 16 8 ...
Страница 265: ......
Страница 266: ......