2.
Assemble the master-boom-valve manifold,
gasket, and master boom bypass valve with a
clamp tightened hand tight (A of
).
3.
Align the flange of the master-boom-valve
manifold, a gasket, and the agitation-valve
manifold (B of
4.
Assemble the master-boom-valve manifold,
gasket, and agitation valve manifold with a
clamp and tighten by hand (B of
)
5.
Align the flange of the master-boom-valve
manifold, a gasket, and the 90° flanged elbow
(at the end of the hose for the flow meter; refer
to B of
6.
Assemble the master-boom-valve manifold,
gasket, and 90° flanged elbow with a clamp and
tighten by hand (B of
).
7.
Assemble the agitation valve to the valve mount
with the flanged-head bolt and flanged locknut
that you removed in step
of
Master Boom Manifold Valve (page 68)
and
torque the nut and bolt to 1017 to 1243 N-cm
(90 to 110 in-lb).
Installing the Section Manifold
Valve
1.
Insert the upper endcap fitting of the manifold
valve into the bypass fitting (A of
Note:
If needed, loosen the mounting hardware
for the bypass fitting as needed to provide
clearance.
g028245
Figure 104
1.
Flange (reducer coupling)
6.
Socket (outlet fitting)
2.
Socket (bypass fitting)
7.
Retainer
3.
Bypass fitting
8.
Flange (manifold—section
valve)
4.
Flange (adjacent
manifold—agitation valve)
9.
Gasket
5.
Endcap fitting (manifold
valve assembly)
10.
Flange clamp
2.
Secure the endcap fitting to the bypass fitting by
inserting a retainer into the socket of the bypass
fitting (A of
).
3.
Assemble the outlet fitting onto the lower endcap
fitting of the manifold valve (A of
).
4.
Secure the endcap fitting to the outlet fitting by
inserting a retainer into the socket of the outlet
fitting (A of
)
5.
Align a gasket between the flanges of the
reducer coupling and the section valve manifold
(B of
).
6.
Assemble the reducer coupling, gasket, and
section valve manifold with a clamp and tighten
by hand ( B of
7.
If installing the 2 left most section valves, align
a gasket between the flanges of the 2 adjacent
section valve manifolds (B of
8.
Assemble the and 2 adjacent section valve
manifolds and gasket with a clamp and tighten
by hand (B of
9.
For the left or right boom section valves,
assemble the valves to the valve mount with
the flanged-head bolt and flanged locknut that
you removed in step
of
Manifold Valve (page 69)
and torque the nuts
and bolts to 1017 to 1243 N-cm (90 to 110 in-lb).
74
Содержание Multi Pro WM 41240
Страница 79: ...Schematics g255886 Flow Diagram Sprayer System DWG 125 0699 Rev B 79...
Страница 80: ...Notes...
Страница 81: ...Notes...
Страница 82: ...Notes...