g028539
Figure 102
1.
Flange clamp
5.
Flanged-head
bolt
9.
Flange (master
boom valve)
2.
Gasket
6.
Valve mount
10.
Flange
(adapter
fitting—agitation
throttle valve)
3.
Manifold
(agitation
valve)
7.
Flanged
locknut
4.
Flange
(manifold—agitation
bypass valve)
8.
Flange (rate
control valve)
2.
Assemble the agitation bypass valve, gasket,
and agitation valve manifold with a clamp and
tighten by hand (A of
).
3.
Align a gasket between the flanges of the rate
control valve and the agitation valve manifold
(B of
).
4.
Assemble the rate control valve, gasket, and
agitation valve manifold with a clamp and tighten
by hand ( B of
5.
Align a gasket between the flanges of the
agitation valve manifold and the master boom
valve (B of
).
6.
Assemble the agitation valve manifold, gasket,
and master boom valve with a clamp and tighten
by hand (B of
7.
Align a gasket between the flanges of the
agitation valve manifold and the adapter fitting
for the agitation throttle valve (C of
).
8.
Assemble the agitation valve manifold, gasket,
and adapter fitting with a clamp and tighten by
hand (C of
).
9.
Assemble the agitation valve to the valve mount
with the flanged-head bolt and flanged locknut
that you removed in step
of
Agitation Manifold Valve (page 67)
and torque
the nut and bolt to 1017 to 1243 N-cm (90 to
110 in-lb).
10.
If you loosened the mounting hardware for the
master boom valve, tighten the nut and bolt to
1978 to 2542 N-cm (175 to 225 in-lb).
Installing the Master Boom
Manifold Valve
1.
Align the flange of the master-boom-valve
manifold, a gasket, and the flange of the master
boom bypass valve (A of
g028546
Figure 103
1.
Flange clamp
6.
Valve mount
2.
Gasket
7.
Flanged locknut
3.
Manifold (master boom
valve)
8.
Flange (agitation valve)
4.
Flange (bypass —master
boom valve)
9.
90° flanged elbow
5.
Flanged-head bolt
73
Содержание Multi Pro WM 41240
Страница 79: ...Schematics g255886 Flow Diagram Sprayer System DWG 125 0699 Rev B 79...
Страница 80: ...Notes...
Страница 81: ...Notes...
Страница 82: ...Notes...