3
|
Installation Environmental Considerations
Section
Section
Thermo Scientific
Orion 2295 Phosphate Analyzer
|
13
Locate the analyzer height such that the display is at eye-level height for an operator,
allowing also for appropriate sample and drain connections.
Figure 3: Mounting dimensions
Figure 4: Typical external plumbing
connections
CAUTION
AIR PURGE
AIR PURGE
AIR VENT
I/O SIGNALS
POWER IN
70mm(2.75 ")
304.8mm (12.0")
674.6mm (
26.5")
330.
3mm (
13.0 ")
162mm (6.4")
698mm (27.5")
152mm (6")
406mm (16")
SAMPLE
STANDARD
REAGENT 1
VALVE
SAMPLE CHAMBER
REAGENTS BOTTLES MUST BE KEPT TIGHTLY CLOSED.
Observe all health and safety procedures for handling chemicals.
Wash any spillage with Distilled water.
Allow enclosure to vent any trapped fumes before setvicing.
Air purge of enclosure is recommended.
EMPTY A
LL REAGENTS BEFORE SHUTTING UNIT DOWN.
SAMPLE CHAMBER
SAMPLE (BACK) N.C.
STANDARD (FRONT) N.O.
RGT
RGT
STD
REAGENT
STANDARD
SAMPLE
SAMPLE IN
SAMPLE RETURN
FLOW DIRECTION
FILTERED AND OIL FREE
AIR PURGE SUPPLY LINE
CONNECT TO
ATMOSPHERIC DRAIN
FLOW DIRECTION
SHUT-OFF
VALVE
AC MAINS
1
0
POWER CIRCUIT BREAKER
MUST BE CLEARLY IDENTIFIED
INSTALL HEIGHT TO
OPERATOR EYE LEVEL
PROCESS LINE
USER TO INSTALL A 40 to 60 MICRON
FILTER, SIZE IS BASED ON SAMPLE
CONDITION, SET FLOW RATE
BETWEEN : 50 TO 500 ML/MIN
AC POWER
DRAIN
SAMPLE (INLET)