9
|
Maintenance Schedule
60
|
Orion 2295 Phosphate Analyzer
Thermo Scientific
Section
Section
Disconnect the tubing. Replace one a time to reduce the risk of errors in connection.
Replace the pump tubing as described in
Plumbing Connections
Section.
Replace with identical tubing from the maintenance kit by reversing the procedure. Apply
silicone lubricant (supplied with the kit) to the pump rollers before re-installing the tubing.
SAMPLE/STANDARD
Reagent Pump
PUMP (larger tubing OD)
(smaller tubing OD)
Figure 12: Maintenance kit assembly detail
Always use 2 drops of Silicone Oil on the platen before replacing on pump
NOTE:
PRIME FLUIDICS
menu the (-) sign for the priming volume will be reset to
(+) upon next menu entry.