2
|
Introduction
Section
Section
Thermo Scientific
Orion 2295 Phosphate Analyzer
|
5
Unpacking the Instrument
Remove the analyzer from its shipping carton and inspect it for damage.
If damage is evident or if the shipment is incomplete, please contact the Customer Service
department. Do not destroy the shipping container during unpacking so that you can save it for
possible future use.
Startup Procedure
This section describes the necessary steps to begin using the Orion 2295 Phosphate Analyzer.
Refer to
Section 3
for instructions on mounting the analyzer, making the plumbing connections,
and connecting electrical power. More details can be found in subsequent chapters.
Once the analyzer is securely mounted in a fixed location, wired to electrical power, wired to
communications, (if necessary) and plumbed to process water, perform the following instrument
startup procedure:
1. Power on instrument.
2. To allow longer lifetime of unit, the pump-head tubing are not fully engaged when the unit is
shipped. Refer to
Plumbing Connections
section.
a. Reset tubes in pumps heads.
Note:
This step must be repeated for all pump heads.
i. Remove tape.
ii. Slide tube retainer into place along keyway.
iii. Install tubing cover by squeezing both sides, and sliding into grooves.
3. Install reagents. Very carefully match reagent numbers and colors in their proper order.
Refer to Section 3,
Installing the Reagent
section.
NOTE:
The analyzer may be shipped with a translucent protective cover on the
LCD. Carefully peel off this translucent layer and discard it.
WARNING
DO NOT APPLY ELECTRICAL POWER TO VISIBLY DAMAGED
COMPONENTS, AS INJURY OR FURTHER EQUIPMENT DAMAGE
MAY OCCUR.
NOTES:
It is recommended to wear latex gloves whenever handling or changing
reagents.
Turn the reagent cap clockwise while holding bottle vertical and level.
Inspect the tubes to be sure none have been pinched.