58
|
Orion 2295 Phosphate Analyzer
Thermo Scientific
S E C T I O N
9
Maintenance Schedule
Maintenance
Schedule Frequency
Conduct regular maintenance
to ensure the analyzer performs properly.
Every week
Inspect in / out tubes, reagent bottle, and all tubes for fouling.
Every month
Inspect tubing and ensure that it is not blocked.
Every 1.5 months
Replace reagent if necessary every 45 days.
Every 12 months
Replace pump tubing. Use factory supplied maintenance kit. Inspect for
any fouling of the reaction cell.