9.
The resulting bead volume is then updated to the pre-defined bead site, and will be captured in the
Summary report
.
10.
The
Prepare
screen shows how the consumables should be prepared (which bags contain what
and how much of the various solutions), and is intended to help get the system ready for the
actual run. Select
Add notes
to add pre-run notes to the summary report. Use the
How to
install
function to get instructions for installing the kit. Select
Confirm
, when all bags have been
prepared, connected to the kit, and kit installed on the instrument.
11.
Confirm Installation
is the final screen before the run is initiated and includes important check
points to go through before starting the run.
Note:
The most common error is to start the run without having opened clamps on the
buffer/cell/bead bags, which are not controlled by the instrument. It is therefore important to check
those before initiating the run.
Chapter 3
Embedded graphical user interface (eGUI) user instructions
Run protocol
3
72
CTS
™
DynaCellect
™
Magnetic Separation System User Guide
Содержание A55867
Страница 197: ......