Servicing
I/O Replacement
Thermo Scientific
42iQLS Instruction Manual
7-15
4.
During install, make sure to align cutout circular to keyway.
5.
Insert board downwards.
Figure 7–17.
I/O Replacement, Install
6.
Close arm. Make sure expansion bracket aligns to the inside of the
rectangular cutouts.
Figure 7–18.
I/O Replacement, Close Arm Alignment
Содержание 42iQLS
Страница 1: ...42iQLS Instruction Manual Low Source NO NO2 NOx Analyzer 117436 00 1Sep2019 ...
Страница 2: ......
Страница 18: ......
Страница 34: ...Operation Instrument Display 3 8 42iQLS Instruction Manual Thermo Scientific ...
Страница 192: ......
Страница 199: ...Maintenance Pump Rebuilding Thermo Scientific 42iQLS Instruction Manual 5 7 Figure 5 3 Pump Rebuilding ...
Страница 214: ...Servicing Fan Replacement 7 8 42iQLS Instruction Manual Thermo Scientific Figure 7 8 Replacing the Fan ...
Страница 230: ...Servicing Power Supply Replacement 7 24 42iQLS Instruction Manual Thermo Scientific Figure 7 26 Replacing Power Supply ...
Страница 254: ...Servicing DMC Ozonator 7 48 42iQLS Instruction Manual Thermo Scientific Figure 7 50 Remove Ammonia Scrubber ...
Страница 296: ......
Страница 304: ......
Страница 316: ......
Страница 317: ......