Installation and Setup
Setup Procedure
2-6
42iQLS Instruction Manual
Thermo Scientific
Use the following procedure to setup the instrument:
1.
Connect the sample line to the SAMPLE
bulkhead on the rear panel
(
Figure 2–5
). Ensure that the sample line is not contaminated by dirty,
wet, or incompatible materials. All tubing should be constructed of
PTFE, 316 stainless steel, borosilicate glass, or similar tubing with an
OD of 1/4-inch and a minimum ID of 1/8-inch. The length of the
tubing should be less than 10 feet.
Note
Gas must be delivered to the instrument free of particulates. It may
be necessary to use the PTFE particulate filter as described in “
PTFE
Particulate Filter
” on page
9-19
.
▲
Note
Gas must be delivered to the instrument at atmospheric pressure. It
may be necessary to use an atmospheric bypass plumbing arrangement as
shown in
Figure 2–6
if gas pressure is greater than atmospheric pressure.
▲
2.
Connect the
EXHAUST bulkhead to a suitable vent. The exhaust line
should be 1/4-inch OD with a minimum ID of 1/8-inch. The length of
the exhaust line should be less than 10 feet. Verify that there is no
restriction in this line.
3.
If the optional zero/span solenoid valves are installed, connect a source
of NO
x
-free air to the ZERO IN bulkhead, and connect a source of
NO span gas to the SPAN bulkhead.
4.
Connect a suitable recording device to the rear panel connector. For
detailed information about connecting to the instrument, refer to:
“
Connecting External Devices
” on page
9-1
Communications > “
Analog I/O
” on page
3-107
and “
Digital I/O
”
on page
3-108
.
5.
Plug the instrument into an outlet of the appropriate voltage and
frequency.
Setup Procedure
Содержание 42iQLS
Страница 1: ...42iQLS Instruction Manual Low Source NO NO2 NOx Analyzer 117436 00 1Sep2019 ...
Страница 2: ......
Страница 18: ......
Страница 34: ...Operation Instrument Display 3 8 42iQLS Instruction Manual Thermo Scientific ...
Страница 192: ......
Страница 199: ...Maintenance Pump Rebuilding Thermo Scientific 42iQLS Instruction Manual 5 7 Figure 5 3 Pump Rebuilding ...
Страница 214: ...Servicing Fan Replacement 7 8 42iQLS Instruction Manual Thermo Scientific Figure 7 8 Replacing the Fan ...
Страница 230: ...Servicing Power Supply Replacement 7 24 42iQLS Instruction Manual Thermo Scientific Figure 7 26 Replacing Power Supply ...
Страница 254: ...Servicing DMC Ozonator 7 48 42iQLS Instruction Manual Thermo Scientific Figure 7 50 Remove Ammonia Scrubber ...
Страница 296: ......
Страница 304: ......
Страница 316: ......
Страница 317: ......