Operation
Calibration
3-18
42iQLS Instruction Manual
Thermo Scientific
The Zero/Span Schedule is used to program the instrument to perform
fully automated zero and span checks or adjustments.
Home Screen>Calibration>Zero/Span Schedule
Home Screen>Calibration>Zero/Span Schedule>More
The Zero/Span Schedule contains the following information:
●
Zero/Span Schedule:
Toggles zero/span schedule Enabled or Disabled.
●
Next Time:
Allows the user to view and set the initial date and time
(24-hour format) of the zero/span schedule.
●
Period:
Defines the period or interval between zero/span checks or
calibrations. If period = 0, the schedule runs continuously.
●
Zero Duration:
Sets how long zero air is sampled by the instrument.
●
Span Duration:
Sets how long span gas is sampled by the instrument.
●
Purge Duration:
Sets how long the purge period will be at the end of
the schedule.
Zero/Span Schedule
Содержание 42iQLS
Страница 1: ...42iQLS Instruction Manual Low Source NO NO2 NOx Analyzer 117436 00 1Sep2019 ...
Страница 2: ......
Страница 18: ......
Страница 34: ...Operation Instrument Display 3 8 42iQLS Instruction Manual Thermo Scientific ...
Страница 192: ......
Страница 199: ...Maintenance Pump Rebuilding Thermo Scientific 42iQLS Instruction Manual 5 7 Figure 5 3 Pump Rebuilding ...
Страница 214: ...Servicing Fan Replacement 7 8 42iQLS Instruction Manual Thermo Scientific Figure 7 8 Replacing the Fan ...
Страница 230: ...Servicing Power Supply Replacement 7 24 42iQLS Instruction Manual Thermo Scientific Figure 7 26 Replacing Power Supply ...
Страница 254: ...Servicing DMC Ozonator 7 48 42iQLS Instruction Manual Thermo Scientific Figure 7 50 Remove Ammonia Scrubber ...
Страница 296: ......
Страница 304: ......
Страница 316: ......
Страница 317: ......